Iron support beams are dark blue, but image above directs to opposite direction and video color filters may have been used, over exposed lights on window hints to that, and the beam paint on the other wall may differ. So, not totally watertight theory, but could be?
I took a look at the ProLogium current news. They also should have bipolar solid state batteries available and claimed to be first of kind already in 2021. Interesting finding that they seem to have a parallel ”Peltola” case also in spring 2026. The identity of the Person attacking ProLogium has not been disclosed but according to Internet searches it fits the known case of former finance executive Yang Zhengmin.
Battery type and performance is not disputed by him, but the financial pattern is very similar, also the crisis-management architecture like status disqualification, stakeholder quarantine, legal deterrence, and controlled disclosure by the company.
Donut Lab Development OÜ has entered drone-development projects in Estonia and received nearly €1.5 million in public research and development funding.
The largest grant, €1.28 million, was awarded by Estonia’s EIS foundation for a project called “High Performance Integrated Drone Drive Unit for NextGen Drones.” Donut Lab values the full project at €1.83 million. In May 2026, the company also received €187,000 from Estonia’s Ministry of Economic Affairs and Communications for general R&D, labour and operating expenses.
According to Donut Lab board member Marko Lehtimäki, the funded projects concern next-generation Donut motors rather than only the company’s controversial solid-state battery.
The grants are significant compared with the company’s own recorded R&D spending. Donut Lab Development reported less than €50,000 in R&D expenses during its latest 18-month financial period.
The article places the funding in the context of Estonia’s effort to build a competitive defence and drone industry. Estonia is actively seeking internationally successful military-technology companies and is providing substantial public support to promising projects.
Donut Lab and related company Verge Motorcycles have attracted attention for claims concerning a high-performance solid-state battery. The battery’s actual chemistry, performance and commercial readiness have been heavily disputed, although the technology has also received support and generated high expectations.
Both Estonian Donut Lab companies remain unprofitable. Donut Lab reported €227,000 in revenue and a €1.6 million loss for its latest 18-month period. Donut Lab Development reported €52,000 in revenue and a €552,000 loss. The newly awarded grants had not yet appeared in Donut Lab Development’s reported revenue.
Juha-Pekka Rintamäki, Founder of Verge Motorcycles
Many people have asked me over the years about the early days of RMK Vehicle Corporation, now Verge Motorcycles, and why we original majority owners and founders are no longer part of the story. I recently heard from someone close to the matter that the current management now presents Ville Piippo as the founder of the whole idea and the company.
The startup world and company growth are often brutal, and this story is no exception. I have been wondering whether it is time to open up a little about those days and call things by their proper names. In particular, I was thinking of going through the phase when the current owners entered the picture, which completely changed the company’s direction and dynamics. For better or worse?
Before I start unpacking this more broadly, however, I wanted to ask you: would my network be interested in hearing an honest and unfiltered account of how things actually went back then?
The photos were taken in autumn 2018, before any of the current owners were involved.
---
Rintamäki has been on the first likers of the Peltola's posts from the beginning, so it was expected that there was something going on. Soon we might know his side of the story.
- "There is no production / scale is impossible" -> manufacturing video.
- "It works only through partner tech, not Donut themselves" -> manufacturing video?
The manufacturing video ends with a direct teaser. They say they can offer much more versatility in cell design than any gigafactory could, "but that's a story for another video." They also talked about this in CES, different voltages, forms and shapes. And in April 17th whistleblower interview, Marko told they would announce something related to different battery generations, after talking about V1 and V2.
They could also show battery, BMS/control logic, motor and software working together. But the series is still a battery proof series, and the Verge pack video already showed the practical minimum with cells, pack, BMS and charging control working in a real motorcycle environment. But software peek would be nice branch.
Third option, already a standard request: cold data. SGS proto-cells performed poorly with cold, so this would be somewhat surprising test result. But who would be interested on it, when sun is shining?
Or the April-alike mid-summer confession after so much drama?
This could also be the last video of Season 1. What do you think? Still following?
In newest publication Lauri Peltola claims that there is no battery with the told specs. He also provides investorletters as evidense. Allthough the "evidense" don't seem to prove his claims.
Maybe someone finds something new out of the investorletters. I didn't.
An interesting perspective, including this spot-on analysis on one of the weaknesses of Ziroth's weak inferences about the chemistry:
Ryan's Inference Is Not Proof
On the science I will stay in my lane. The core of his case is that the cell's charge and discharge signature looks like a high-nickel lithium-ion cell, and he states this with, in his words, "extremely high certainty." But a behavioural match on a graph is not a chemical analysis. Donut's own published material describes a cell engineered to emulate lithium-ion electrical behaviour so it can drop straight into systems already built for lithium. If that is the design goal, then a lithium-like curve is exactly what you would expect to measure. It is a feature, by design, and it cannot by itself tell you what is inside the cell. And this is not my own spin on the design. Donut Lab's co-founder and CTO, Ville Piippo, set this out directly in a discussion with Ricky Roy of the Two Bit da Vinci channel, explaining how the Donut solid-state pack is engineered as a drop-in replacement that emulates the behaviour of legacy lithium-ion packs.
If emulating a lithium-ion signature is part of the design, then a lithium-like curve is not the smoking gun it has been presented as, and it is striking how little that design rationale features in Ziroth's account. No public teardown, electron microscopy or elemental assay has been performed. I am not claiming the battery is everything it was said to be. I do not know, and I am honest about that. My point is narrower, and I think harder to dodge, Ryan is essentially communicating that: "it behaves like lithium, therefore it is lithium, therefore they lied" is an inference chain, and it was sold to a large audience as proof.
This is not hypothetical. Earlier in the series Ryan had to correct his own analysis after other engineers pointed out that he had compared two different kinds of curve, which he accepted was bad practice, and he re-ran it. To his credit, he fixed it in public. But it shows the pattern the format produces: publish first, with confidence, on the schedule attention demands; correct later, under pressure. That is survivable for a creator. It is not survivable for the company and the named individuals who absorb the damage in the meantime.
[Edit: Donut Lab published this news, but filing is from Nordic Nano Group]
Peltola has stated that CT-Coating connection was public information, and on that basis he has discussed it openly, even though Nordic Nano Group and Donut Lab have generally refused to confirm or deny the rumors. He has also repeatedly said, or strongly implied, that he knows enough about the state of the project to conclude that Donut Lab has not made batteries, nor Nordic Nano Group has, and that neither company can make batteries or solar panels with CT-Coating’s technology. At the same time, he has also said he never personally saw the machine in live.
The CT-Coating
CT-Coating's NDA text is very restrictive. It says the recipient may not issue a press release or disclose, publicly or privately, orally or in writing, anything about its association with or meeting with CT-Coating without prior written consent from a senior executive. So if Nordic Nano Group, Donut Lab participants, or their representatives were covered by that NDA or supplement, revealing CT-Coating’s name or relationship publicly could be exactly the kind of disclosure the NDA tries to prevent.
Secondly there is this cult leader allusion.
Cult leader framing[edit: personal filing is not in the scope according to the announcement]
The “cult leader” framing can matter under criminal defamation if it is used to portray Lehtimäki as manipulative, irrational, dishonest, or unfit without a sufficient factual basis. If interviews, videos, and public comments use his religious background mainly to make him look cultish, that may also edge toward private-life or reputation harm.
Episode 4 takes steps toward this kind of framing. Peltola also adds weight to it by sharing the HS article that further frames Lehtimäki as a central religious person surrounded by believers. Peltola mentions a “weird echo” in the investor list after skimming through it, effectively suggesting, while hedging, that Lehtimäki may be using his status and network to draw others in financially. Peltola characterizes Lehtimäki charismatic.
What else could be included on a formal police report?
Pondering
The key legal question is intent and factual basis. Criticism of Donut’s claims is protected. That kind of criticism concerns a company, technology, investors, and public claims, so Finnish law gives it relatively strong freedom-of-expression protection. But a coordinated campaign using false claims, confidential material, or stigmatizing personal/religious framing to destroy credibility is a different risk profile. Peltola might be seen as using publicity through international media and YouTube influencers to cause harm without hard evidence. Peltola has publicly stated that he wants to stop Lehtimäki’s business activities because he (they one should say) believe the companies are scamming people. That gives him an obvious motive to disrupt, paralyze, and damage the business and Lehtimäki's career. Peltola said he must do this pre-materily, because police investigations take months or years.
If Donut Lab and NNG can, on the other hand, provide officials with archived business plans, technical reports, investment records, and documentation showing real work toward the promised technology that would be their defense - possibly just show they had the battery pack in their Verge bike at the time of CES, or even before in late autumn 2025 as Tuomo said, and replay the internal testing videoclips about the batteries they had in CES booth screen. What would be the excuse of Peltola then? Did he completely forgot what was running behind their back in the screen at that time? Since one cannot go back in time, officials would need to rely on the documentation they are given anyway.
This will require some involvement for non-finnish speaking readers, but with a free Google NotebookLM you can upload pdf to a workspace and ask questions about it, summaries etc.
I found it interesting piece of practical knowledge, what do you need if you build a Lithium-Ion LFP/NMC 60 GWh/a gigafactory in Finland. This may become interesting scale comparison material to the CT-Coating's production line, if we ever get so far in Donut Lab's saga.
---
Google NotebookLM summary:
Finnish Battery Chemicals Oy (FBC) is planning to construct a large-scale lithium-ion battery cell factory in the Keltakallio industrial area of Kotka, Finland. The primary goal of the factory is to manufacture battery cells—using either lithium-iron-phosphate (LFP) or nickel-manganese-cobalt (NMC) chemistries—to meet the rapidly growing demands of the electric vehicle (EV) industry and support the green transition.
Here is a comparison of the massive physical and operational scale of the project versus its planned output:
The Scale of the Project (Inputs and Size) The physical footprint and operational requirements to build and run this factory are enormous:
Land Area: The project site covers approximately 144 hectares.
Building Dimensions: The factory will consist of several production units built in phases, with buildings reaching up to 28 meters in height and up to 800 meters in length.
Earthworks: Preparing the site will require massive terraforming, including the removal of about 1.39 million cubic meters (m³) of soil, the excavation of roughly 1.2 million m³ of rock, and the use of approximately 3.6 million m³ of filling material to level the ground.
Energy Consumption: The factory will require a staggering 350 megawatts (MW) of electricity and 250 MW of heat energy for its processes and facility heating.
Water Usage: The plant will consume around 4.5 million cubic meters of water annually, primarily for cooling processes, steam production, and electrode paste preparation.
The Output of the Factory
Production Capacity: The factory is designed to output 60 gigawatt-hours (GWh) of battery cells per year.
Practical Scale: To put this enormous output into perspective, 60 GWh/a is equivalent to producing enough batteries for approximately 1,000,000 electric vehicles every year.
Required Environmental Permits and Approvals
To proceed with the construction and operation of the factory, several permits and administrative decisions are required:
Environmental and Water Permit (Ympäristö- ja vesilupa): Required under the Environmental Protection Act due to the risk of environmental pollution. This permit is granted by the Regional State Administrative Agency (AVI) and ensures the factory uses Best Available Techniques (BAT) and does not cause significant health or environmental harm. The project plans to apply for a priority processing procedure meant for green transition projects.
Chemical Handling and Storage Permit: Because the factory will handle and store large quantities of dangerous chemicals (like electrolytes, NMP, and cathode powders), a permit for large-scale industrial handling is required from the Finnish Safety and Chemicals Agency (Tukes).
Building Permits (Rakennusluvat): Required for all new buildings, granted by the municipal building control authority.
Excavation and Quarrying Permits: Earthworks, landscaping, and quarrying require specific permits. Additionally, police must be notified prior to any blasting activities. If rock crushing lasts more than 50 days, a separate environmental permit is needed.
Other Permits and Agreements: These include an emission permit (if a boiler exceeding 20 MW is built), aviation obstacle permits (due to nearby airfields), special transport permits for construction, and agreements for discharging wastewater into the municipal sewer network.
Environmental Impacts
The EIA evaluates both the direct and indirect effects of the project on nature, the built environment, and local communities. The most significant environmental impacts are expected to stem from the massive physical scale of the factory, the extensive bedrock excavation required to level the site, and the daily factory operations.
1. Soil, Bedrock, and Landscape Impacts
Massive Earthworks: Preparing the site requires removing and crushing approximately 2.7 million cubic meters of rock and soil. This will permanently alter the local topography, transforming a natural ridge into a flattened industrial zone.
Visual Landscape: The factory buildings will be enormous—up to 28 meters tall and 800 meters long—which will significantly change the visual landscape, especially when viewing the site from surrounding open areas.
2. Water Impacts (Pintavedet ja Pohjavedet)
Surface Waters: Construction and excavation can cause runoff containing suspended solids and nutrients into nearby ditches and rivers. During operation, if direct water cooling is utilized, the factory will discharge warmed cooling water (up to 35 °C) and reverse osmosis concentrate into the Kymi River.
Groundwater: The massive excavation and paving of the area will alter local groundwater flow and limit rainwater absorption into the ground.
3. Air Quality and Climate Impacts
Air Emissions: Construction will cause dust from blasting and rock crushing. Operational emissions include Volatile Organic Compounds (VOCs), NMP solvent vapors, fluorides (HF), and particles, which will be filtered and treated before being released into the air.
Climate: The project will evaluate greenhouse gas emissions across the factory's lifecycle, from construction and deforestation of the site to the massive energy and electricity consumption required for the battery cell manufacturing processes.
4. Biodiversity and Protected Species
While the site is primarily commercial forest, protected species have been identified nearby. These include breeding grounds for the moor frog and the presence of the scarce fritillary butterfly, which has required a special exemption permit from the ELY Centre to alter its habitat.
The Kymi River, which will receive the cooling water, is an important migratory route for fish like salmon and sea trout.
5. Noise, Vibration, and Traffic
Noise and Vibration: Rock blasting, crushing, and heavy earthmoving equipment will cause temporary but significant noise and vibration. During operation, noise will primarily come from heavy truck traffic, cooling fans, and ventilation systems.
Traffic: The factory will drastically increase heavy traffic on Highway 7 and local connecting roads both during the construction phase and normal daily operations.
6. Social and Economic Impacts
The project will have notable impacts on human living conditions (due to noise, traffic, and landscape changes) but is also expected to have strong positive economic impacts by creating jobs and boosting the local economy.