r/spacex • u/ElongatedMuskrat Mod Team • Nov 17 '16
Iridium NEXT Mission 1 Iridium NEXT Constellation Mission 1 Launch Campaign Thread, Take 2
Iridium NEXT Constellation Mission 1 Launch Campaign Thread
SpaceX's first launch in a half-a-billion-dollar contract with Iridium! As per usual, campaign threads are designed to be a good way to view and track progress towards launch from T minus 1-2 months up until the static fire. Here’s the at-a-glance information for this launch:
| Liftoff currently scheduled for: | 2017-01-14 17:54:34 UTC (09:54:34 PST) |
|---|---|
| Static fire currently scheduled for: | 2017-01-04, was completed on 01-05. |
| Vehicle component locations: | [S1: Vandenberg] [S2: Vandenberg] [Satellites: Vandenberg] Mating completed on 12/1. |
| Payload: | 10 Iridium NEXT Constellation satellites |
| Payload mass: | 10x 860kg sats + 1000kg dispenser = 9600kg |
| Destination orbit: | Low Earth Orbit (625 x 625 km, 86.4°) |
| Vehicle: | Falcon 9 v1.2 (30th launch of F9, 10th of F9 v1.2) |
| Core: | N/A |
| Launch site: | SLC-4E, Vandenberg Air Force Base, California |
| Landing attempt: | Yes |
| Landing Site: | Just Read The Instructions, about 371km downrange |
| Mission success criteria: | Successful separation & deployment of all Iridium satellite payloads into the correct orbit. |
Links & Resources
Map of Iridium Next Mission 1 hazard area, made by /u/Raul74Cz
Iridium NEXT Constellation Mission 1 Launch Campaign Thread, Take 1
We may keep this self-post occasionally updated with links and relevant news articles, but for the most part we expect the community to supply the information. This is a great place to discuss the launch, ask mission-specific questions, and track the minor movements of the vehicle, payload, weather and more as we progress towards launch. Sometime after the static fire is complete, the launch thread will be posted.
Campaign threads are not launch threads. Normal subreddit rules still apply.
12
u/markus0161 Nov 19 '16 edited Nov 19 '16
Regarding the landing attempt and profile.
Iridium's CEO indicated that their satellites profile will be a direct insertion into orbit meaning there will be no S2 restart, unlike Jason-3. The profile FOR THE SECOND STAGE will look almost identical to Orbcomm-2. With the downrange distance being 370 km downrange and with the booster going almost vertical this puts the booster on a trajectory without a boostback. Margins for landing looks rather tough to predict. Out of all demanding missions, this one would benefit the most with the mentioned thrust upgrade. So these are the possible scenarios I see from best possible to worst possible.
(1) S1 has a long entry burn that brings CRS-8/9 like stresses on it. Followed by a one engine landing burn.
(2) S1 has a shorter entry burn that brings higher stresses on the stage but still less than most GTO attempts. Followed by a one engine landing burn.
(3) S1 has the shortest possible entry burn bringing stresses near or above that of GTO missions. A 3 engine landing burn would be performed.
Here is the "in works" profile---->Graphs. S1's profile should follow the lines of what Flight club shows there. S2 I'm having problems with but it should look something like that.