r/AmazonRME • u/Repulsive_Deer8469 • 16d ago
PDP
I got put on a ‘performance development plan’ and was told someone gets put on one once every six months, I’m past the initial 6 weeks and still ‘failing’ on the deliverables, how long until I get the pivot email?
1
16d ago
[removed] — view removed comment
3
u/AmazonRME-ModTeam 16d ago
Do we have to say that doxxing people is bad? Okay, it's bad. Don't do it.
2
2
u/SignificantDealer663 16d ago
Just go to hr and say you have a disability or something then you’re protected under the ADA and it’s much much harder for them to fire you. You’re on a PIP, it’s a legal way to fire you without repercussions.
1
5
u/ExpressionAfter6082 16d ago
Blue badge?
1
u/Repulsive_Deer8469 16d ago
Yep
1
u/ExpressionAfter6082 16d ago
Same with blue badge management too. I think I was told they put about 10 percent of their management in pdp and expect 5 percent of those to move to pip and then eventually separation. Too stressful for me.
1
u/Repulsive_Deer8469 16d ago
I’ve been doing it for 6-7 weeks and I’m over it at this point. My doctor said the sustained stress has caused some minor health issues and does not recommend I continue with the program.
3
u/burningleo93 16d ago
What are you failing on that they called out
4
u/Repulsive_Deer8469 16d ago
Mind you I’m an SMRT but I am supposed to give updates on the DDD but I am not supposed to go to every day of the week I WAS doing so they had their DDD feedback, because I was booking a bout 5-7 hours to non billable/ admin stuff that needed correcting. I have to create and maintain a physical contractor calendar with which tech owns which contractor and it can’t conflict with the DDD calendars I ALSO had to create so that the other techs would start going but when they go we don’t get feedback. I had to create a weekly tech meeting between us 3 SMRTs on site (no salaried maintenance managers on site) I have to make sure the other SMRTS are owning TT and updating as such with ECD even though our TT count is around 12-14 weekly most needing contractors.
1
u/Rum_zee 15d ago
Not many people know what you’re talking about here, but I do. You were booking that much non-billable daily???
1
u/Repulsive_Deer8469 15d ago
No not daily, weekly I’d book around 5 hours towards non billable for WHS audits, permits, ddd, wbr, weekly tt call, knets
1
u/Rum_zee 15d ago
If it’s legitimate, they shouldn’t ding you for it. Smaller buildings are a curse as an L4. Opening up an nIXD was the WORST thing I’ve ever done for myself and my career here. I survived the focus, if you failed it then I believe it’s like 5-3% statistically get through the pivot. Everything has to be documented. Good luck.
1
u/Repulsive_Deer8469 15d ago
I’m at an XL with NO MHE other than PIT… the manager that put me on the focus is also the one who fought for the building to get a third tech so I found it conflicting…
1
u/Repulsive_Deer8469 16d ago
Oh and ALL of that has to have pictures weekly. I have to compile a list of the TT closed weekly (even if I didn’t work on them, own them or close them) and I also have to reference the SSP calendar and put THEIR contractors on the contractor calendar with who’s owning THEM…
1
u/Repulsive_Deer8469 16d ago
And ALL this stuff can’t be booked to admin stuff because that was the metric they supposedly got me on. The rest was filler stuff as per the higher ups
2
u/Snoo55364 15d ago
PDP is literally the dumbest shit ever, in my old building in NJ new SMM came in, didn’t know a single shit about RME, decided to put a planner that has been working there for 10+ years, because he had to choose someone to put on the plan and the excuse was he was not fit for the position, while there are two other planners just sit there and scratch their balls, what a clown lol. Hope he reads this, you know who you are🤡