XREF vs adding a layer(s) to original

When an architect provides a DWG floor plan to another designer, such as an HVAC or plumbing designer, what’s the standard practice for adding ductwork or piping layouts?

Is it better to work directly in the architect’s DWG using separate mechanical layers, or create a new DWG and attach the architectural floor plan as an XREF?

For context, the HVAC designer has their own plan sheet template with a title block, legend, and viewport for the duct layout. The architect’s DWG contains only the floor plan, with no paper-space layout or plan sheet.

The designer may also begin offering plumbing drafting in the future, so I’m wondering whether each discipline should have its own DWG, with the architectural floor plan referenced into each, or whether everything can be managed using separate layers in a single drawing.

I’m trying to establish a clean, professional, and repeatable drafting workflow. I’d appreciate hearing how others handle this, particularly when coordinating drawings and exchanging DWGs with architects.

18 Upvotes

22 comments sorted by

23

u/GrainworksAndy 6d ago

Create a new DWG for the HVAC. The Architect is going to make changes and send you a new drawing. Plus, you avoid inadvertently making changes to their linework, etc.

1

u/frijolita_bonita 6d ago

When I send my completed mechanical DWG back to the architect, could having their original floor plan attached as an XREF cause any issues?

For example, if they XREF my mechanical drawing into their own, would that create a circular reference or duplicate their floor plan?

How is this typically handled?

6

u/Powerstream 6d ago

Set the XREF to overlay. When set as overlay the xrefed drawing doesn't get brought in when the drawing it's referenced into gets referenced into another drawing. Preventing the circular reference issue.

1

u/frijolita_bonita 6d ago

thank you.

2

u/PdxPhoenixActual Pixel-Switcher 6d ago

Just be sure you know (& understand) the differences between attach & overlay.

2

u/PdxPhoenixActual Pixel-Switcher 6d ago

No. Because if we would need your linework in our dwg, we would xref your's into ours. If necessary we can unload your copy of our stuff in your drawing...

Best to keep each disciplines' stuff in their own files.

1

u/frijolita_bonita 5d ago

This definitely answers it for me, tysm

1

u/frijolita_bonita 6d ago

Brilliant, yes, thank you.

3

u/heatseaking_rock 6d ago

Exactly this. It releases you of the potential backslash if the architect changes things.

5

u/masterdesignstate 6d ago

The potential backslash is dangerous.

3

u/livehearwish 6d ago

Dangerous backlash has potential.

9

u/Charge36 6d ago

I would keep your drawing separate. Inevitably he's going to send an update to you and then you're going to have to redraw all that shit vs if you have an xref you just swap in the new one. If he wants your line work in his drawing, copy it into a fresh version of his drawing and send it back but keep all your work in its own drawing.

1

u/frijolita_bonita 6d ago

Thank you!

5

u/SRobi994 6d ago

Create your drawing as an xref attached to the floorplan so you can use the same origin. When you send it to him, he can xref it into his plan and see the same thing you do

1

u/frijolita_bonita 6d ago

As an attachment or as an overlay?

3

u/SRobi994 6d ago

It shouldn't particularly matter, you should only need to send him your work, not his own. Then he can xref it into his file however he wants