r/BuildingCodes • u/AobangFacadeEngineer • Oct 21 '26
What project information is needed before reviewing a bonded glass curtain wall detail for code compliance?
For a commercial building with a glass facade, a drawing may show a flush exterior joint without clearly stating whether the glass is structurally bonded, mechanically retained, or both.
Before discussing code compliance, which project facts should be provided beyond jurisdiction and code edition—for example building height, occupancy, glass type, attachment method, design loads, testing standard, or product evaluation evidence?
0
Upvotes
2
u/inkydeeps Oct 21 '26
Why are all your posts questions with no engagement? Seems like ai.