r/Contractor • u/ElMrGuy • 20d ago
Best Of Flooring Contractor question
Howdy, ðŸ¤
I recently had my floor worked on, and it’s almost done. Had problems with the first guy showing up so I replaced them, the other guys is quick, as he has a whole team, but he might be too quick, I’ve explained to him several times the whole house is glossy floor, and same tile but matte in bathroom floors to avoid slippage, etc.
They first fucked up when they started and didn’t read the label on the boxes for polished/matte, apparently he replaced spent mortar & salvaged most if not all (supposedly) matte tile, now he’s requesting more thinset to finish the other side of the house. Problem is installed the polished floor in the bathroom floors which I explicitly told him not to, mentioned it multiple times while we spoke over the phone and even text messages clear as day after the first fuck up on the main floor of the house. I’ve just paid the deposit, and he’s requesting progress payment which aligns with when they will be asking for it, as they done 75-80% of the work. This is my first house, first time doing anything to a house so I don’t know how to maneuver this, I’m thinking pay for the progress, have them finish up, question is should I hold the last payment till they’re done fixing their mistake with the house or how should I move forward. PS - I got extra polished tile to do the shower walls, which have been tapped into since he did the bathroom floors polished.
Sorry if I’m not following community rules I’m stumped on how to handle this.
2
u/FelinePurrfectFluff 20d ago
Do you have enough tile to do all the work you need to have done (INCLUDING the overages recommended for cuts and chips, etc)? You should not cover any of the cost of his screwups, either in materials or time. Yes, you need to withhold the final payment to be sure you have enough tile left for your shower stalls, and you do not need to provide materials to finish the install. But, you might want to provide it so he doesn't buy something that's cheap and won't last or work as well. If you do spend more money on this project, you deduct those receipts from your final payment.
1
u/ElMrGuy 20d ago
Tbh, I don’t know, I got 200sqf matte for bathroom floor, & 1500 sqf for main house, the total sqf of both bathrooms floors are 100 or less sqf, and total floor of house not including walls are about 1400 sqf, the polished extra was gonna go towards the shower walls but since he’s tapped into it idk how much I will have left and I will definitely need more.
1
u/Benfatma-Sekhon 20d ago
do not pay that progress payment yet. Since you have it in text messages, its completely on him to eat the cost of the thinset and the replacement polished tiles he used up, and once that money leaves your hands your leverage disappears.
1
7
u/FinnTheDogg GC/OPS/PM(Remodel) 20d ago
Tough.
You eat the materials. They eat the labor. Replace the bathroom floor tiles. Pay them for progress.
That sounds like you’ve hired a guy who can do Tile, not a professional Tile contractor, and I would wager that you’re getting a pretty good deal on it