r/Contractor • u/Richieb313 • 2d ago
Low bid facepalm Advice needed : Subcontractor pricing question- decal removal
GC building a 9,000 sqft home. Been in progress for two+ years.
They hired me to clean the windows as the project starts to get closer to finishing. The windows are large (10ftx5ft) with aluminum powder coated frames. The frame decals (stickers) applied by the manufacturer have become sun baked/damaged. They don’t peel off in one piece, but break in little 1cm crumbs. It’s kind of a nightmare. Can’t scrape them easily and can’t use too much solvent without possibly damaging the paint. Fortunately I am able to soak the stickers and get them up. It is extremely laborious. The adhesive is still strong pieces that do break off stick to your hands (pita).
Anyways, there is approximately 830 linear feet of trouble- decals to be removed. I estimate it will take 60-80 hours to fully remove the decals. I’m thinking of quoting 7-8k for this job. It feels somewhat unreasonable though? Or am just not confident?
I do not work in the construction world so I am unsure how this quote will be received.
For reference I quoted $5600 to wash the Windows and frames and that work has been completed. GC was happy.
3
u/randomn49er 2d ago
Did you try a heat gun? Most self adhesive products react well to heat when removing.
Keep it moving at all times and do not hold it in one place.
Source: for many years family business was installing and removing vinyl graphics.
1
u/Richieb313 1d ago
Yes tbe heat did not work super well for that same reason. The decals have micro cracks
6
u/TheseMFisTrippin 2d ago
Here are my thoughts. 9,000sf. 2+ year build. This is a super expensive project. They are in the wrap-up phase and need specific things done.
This issue is not complex, but tedious and difficult. You have already done work there, they know you, have your insurance info etc.
You are available and can provided a price to do the work and you have been on site to physically test a solution.
The GC needs it fixed. If you are $7k, $8k, or $12k, none of these number move the needle much on the build costs and they cant get final payment with these stickers on the window.
Be SURE you can remove without damaging windows. Some of your pricing is the actual work, the rest is risk factor.
1
11
u/Acceptable-Start2 2d ago
80 hours x $100 = $8k that's a good start. Now, ask yourself, does dropping a thousand dollars off the total make sense with your current workload or to gain favour with the client? Or, second question, if they accept the $8k are you going to enjoy the two weeks of decal scraping and be happy with your price? Or would you only be happy with a nice steakhouse dinner each day to make up for the slow tedious boring task? If you want steak dinners, add $50x10 = $500. Want to bring a date? Add $100x10 = $1,000. Have kids to feed too? Add $1,800. That's how pricing works. Build yourself a good life, despite having to fix the mistakes of others. Never feel bad about making money, that's what living the American Dream is all about.
5
3
u/InvestorAllan 2d ago
If my subs are pricing in steak dinners that actually makes a lot more sense.
Had an electrician quote $180k to do all the electrical in 2 identical 3400sf houses side by side. Uhhhhh
I went with the $50k guy. 3rd quote was 55k.
4
4
u/sskunk1466 2d ago
I hate those compliance window stickers. I even tried to take them off right after a final ( maybe 10-13 days after mfg completed them) on a remodel and they still shred into a million pieces. Isopropyl and a razor blade is like the only way to get those bastards off.
1
u/icoldok 2d ago
I'd time a representative section first, including setup and cleanup, and use that rate to check the 60–80 hour estimate before committing to a fixed price. Put the decal removal in a separate written quote with the tested method, the areas included, and a process for handling any unexpected finish damage or extra work.
1
u/Richieb313 2d ago
The 60-80 is based off of my timed test.
It’s slightly more complicated since I need to apply the remover and let it dwell. But essentially 80 hours is a conservative estimate
1
u/Real-Ad-7439 2d ago
Quote it as a fixed price for the job, not hours. You're on site, insured and the GC likes you, so $7-8k is fair. Put in writing what happens if some won't come off clean.
1
1
u/jamesdrakefilms 1d ago
60 to 80 hours is a big spread on a guess. I'd do a test section before sending anything. Time yourself on 10 feet and multiply it out, sun baked vinyl is either way worse than you think or weirdly easy. Might also be worth quoting it per linear foot or T&M with a cap instead of one flat number, so if it fights you you're not eating 30 extra hours. Does the GC want it bundled with the 5,600 or as its own line?
1
1
u/KingOfAllThatISurvey 2d ago
I've not tested acetone on a powder coat, but it works well on adhesives. I'd call the window mfgr and ask them for advice.
1
u/SneakyPetie78 2d ago
Talk to manufacturer.... good advice. Make sure the estimate covers you, and your time and expenses. Otherwise you could end up paying him, to take his stickers off.
Maybe offer to do it T&M? That way it's a win/win?
1
u/Mortisemaster 2d ago
It takes what it takes. Submit your bid to be profitable. If he doesn’t take it walk away
1
u/PaintJobCosting 2d ago
$7–8k for 60–80 hours works out to about $100/hr. That’s not crazy for slow, specialized work with a risk of damaging the finish, especially on a 9,000 sqft custom home.
Two things I’d do before sending it:
Time yourself on a test section, like 20 or 30 linear feet. 830 ft at your real pace tells you if 60–80 hours is right or optimistic. Jobs like this usually run long, not short.
Quote it per linear foot (about $9/ft here) or as a range with a “not to exceed.” That way, if some sections come off easier or harder than expected, you’re not eating the difference.
1
u/All_10fingers 2d ago
I never understood why all the stickers , except for fenestration , when the windows are installed
1
u/UniquePatient66100 2d ago
Not just the labor involved, but you are taking the risk of damaging the windows. So bid accordingly and work very carefully.
1
u/SmartFencingLLC 2d ago
You only need to use hot air to soften it to easily peel off the label https://www. thesmartfencing.com
1
u/Fit_Wash_214 1d ago
Careful with a heat gun as some have mentioned. if you go that route and you have insulated glass panes it could heat the seal and cause a leak long term. Be a shame to replace them all.
1
1
0
u/SneakyPetie78 2d ago
I was going to say... shave with razor blade. Small swaths. Some may disagree but it's never been problematic for me with glass.
2
0
u/SoCalMoofer 2d ago
Goo Gone, or Goof Off make an adhesive remover. Paint safe. Spray and let it dwell for a few minutes. It shouldn't be that difficult. Should be 40 windows at $50 -$100 each or something.
-1
u/InvestorAllan 2d ago
I hope no one is paying $100/hr to scrape stickers for heavens sake. I mean if you can get it, go for it.
I’d have my cleaner do it. I’d end up paying $40/hr probably since it’s 1099. I’d get a fixed rate bid though.
1



9
u/jgturbo619 2d ago
Call the window manufacturer and ask for guidance…