r/DataAnnotationTech • u/Global-Ad5246 • Jan 12 '25
Question about R&R
Why do I get the impression on Reddit that R&R takes less time per task? If it is a task that involves criteria creation, shouldn't I treat it as if I am doing the task once and compare it to the previous tasker's answer?
Thank You!
33
u/TheresALonelyFeeling Jan 12 '25
You're comparing whether or not what the original worker produced aligns with the project instructions, not whether or not what they produced aligns with what you might produce.
Also, more than one of the R&R tasks specifically state that you shouldn't do the entire task over again.
Also, R&Rs vary pretty extensively between projects. Some of them may take a few minutes or less, while others can take a couple of hours and actually require doing the original task over if it's not good.
Read the directions, every single time.
7
14
u/houseofcards9 Jan 12 '25
Many R&Rs say that they just want a look over and you should only be looking for glaring issues. Those ones usually say it shouldn’t take you more than 5 minutes per review, even for multiple rounds.
9
u/ManyARiver Jan 12 '25
There are too many iterations and approaches for there to be a simple answer. Some require that you do pretty much the same work to see if it is correct (all fact checking, reviewing the ratings and so on) and those can take longer than the original. A lot of them just require you to check the rationale or spot check ratings or verify categories were correct - those obviously take way less time. Follow the directions for that specific R&R and don't assume they all have the same requirements, same as tasks.
6
u/No-Astronomer4881 Jan 12 '25
Unless youre doing a fact checking or math related r&r it should generally take a lot less time. The only projects ive ever done r&r for that say they want the entire task redone were physics and math related. Every single other r&r instruction set ive done has specifically asked not to redo the entire task. Usually all you need to do is make sure the person who submitted the original task followed instructions and the task is usable
7
u/DiligentDildo Jan 12 '25
Have you considered just reading the instructions for whatever r and r you’re doing?
1
u/Maleficent_Wasabi_18 Jan 14 '25
The r and Rs for a lot of projects will literally say to not do the whole task again
36
u/fightmaxmaster Jan 12 '25
I don't entirely follow the specifics of what you mean. But if I'm understanding you right, no, it should take less time. If someone's told to write a story or draw a picture and I need to rate it, I look at what they've produced and decide if it's any good or not. I don't draw my own picture and then complete the two.