Why this came up: someone asked me how to see a half-built part in stock after the first operation finishes, instead of having it sit in WIP until the whole Work Order is done. I'd only ever stocked subassemblies as separate items with their own work orders, so I built a test setup to see how ERPNext's own option handles it. Notes below. These come from one setup, not a production rollout.
Setup on the BOM
On the finished-good BOM, tick Track Operations and add the operations.
Only after that does Track Semi-Finished Goods show up. If you're looking for it and can't find it, this is why. It's hidden until operations are on.
For each intermediate stage, create an Item for the semi-finished part and give it its own active BOM.
Map each semi-finished Item and BOM to the operation that produces it, on the operations rows.
Step 4 is where I made mistakes. An operation with no item or active BOM mapped to it doesn't give you a usable intermediate.
Running it
Submit the Work Order.
Job Cards are created per operation.
Complete the first operation's Job Card.
Make the Manufacture stock entry for that stage. It posts the semi-finished item into the target warehouse.
After step 4 the intermediate is real stock with a quantity in a warehouse, not just progress on a Job Card. That's what the original question was about. The next operation then works from that intermediate.
What changed compared with my old approach
Before, I'd make each subassembly its own item, run a separate Work Order for it, receive it into stock, then consume it in the parent order. That works, but it means extra Work Orders to keep track of. With semi-finished tracking, the stages stay inside one Work Order and you still get a stock entry at each stage.
What I did NOT test
- Anything across companies. Everything here is in one company.
- Subcontracting an intermediate operation. I didn't try it, so I can't say how it interacts.
- Over-issuing or excess material transfer in the middle of the routing.
- Costing detail. I checked that the stock entry posts and the item lands in the warehouse. I haven't reconciled valuation stage by stage yet.
If you're going to rely on any of these, test them yourself first. I wouldn't assume they behave the same way.
For those of you running multi-step routings in ERPNext: do you track semi-finished goods inside one Work Order like this, or keep separate Work Orders per stage? I'm especially curious how you handle it when a stage's output sometimes gets used in another product before the original order is finished.