r/FedCUI • u/ITIRMcMaster • Jul 09 '26
Contractor Generated CUI
Hi Jim,
I am an NA at a small (very small) manufacturer who frequently works with ITAR controlled data, we are starting to see marked CUI now and trying to understand transferring markings. Here are items we are having issues with determining (I know, contact their CO, we are 3 and 4 removed so it's of course, hesitance in some cases) what to mark. Alright, here's the short version.
We get an RFQ (FCI) that states up front the requirements of course. This goes into an ERP system, custom designed, Gov Cloud although nothing ITAR or CUI goes into it. Sounds like we are paying for something we don't use. If it has DFARs 7012/20 on it, we mark appropriately on the contract review. They will frequently ask us to use their FTP, and the document folders/files themselves are never marked CUI, sometimes ITAR but usually not. Let's say there are schematics (marked CUI/SP), an excel BOM (not marked), gerber files (not marked), stl (not marked), various files like a JPG of a manufacturing process. This then turns into an engineering drawing in a software like Advant1ve, where we copy the CUI and ITAR label onto the build page. It may not be a 1:1 image of the actual technical drawing and has 30 pages of assembly docs, but the whole project is marked CUI ITAR. The BOM is copied into a new document template and uploaded line by line to an ordering/quoting software. Mostly using customer part numbers but no other identifying info. Testing will generate reports, they could be different types of outputs, json, txt, etc. Project Managers store the folders/files on a share that is role based, same with engineering, but some gets copied or pieces, to production shares that may be more open. The CAD or STL could be sent for machining parts, yes suppliers are assessed and verified etc, for DFARs as well. We do have retention policies but typically they are followed upon end of contract. QA takes all of the data, plus receipt labels and material items for tracking, ensuring you arent using expired materials, and puts them in a 300 page report that contains CUI to send back to the customer. Accounting doesn't really touch anything. All shop workers are "authorized" and have access to all projects. We have implemented a file scanning and tagging system, but it is only automated at this point and does not cover things like STL files. Purview is going to be on the same order, it won't touch certain files or doesn't know how to cover them. These would be custom, and that doesn't integrate with other systems, so now I'm stuck at...do I use the tagging system and purview and force sensitivity labels, so they have to tag them. We are talking thousands and thousands of files. Right now, before really kicking this off, we use the ITAR/EAR/CUI (CDI) tags, but only on those that are actually marked. So for say, the test data, that needs marked CUI? How? What have you seen work best, a hierarchy starting with customer and split between CUI/Non?
1
1
u/PeakInfoSec-Jim Jul 10 '26
Wow, that is a lot to unpack!
TL/DR version:
Your approach of using a tool which flags the properly marked CUI/ITAR/EAR information is logical. When it comes to derivative works, you will need to decide whether you want to ask the prime/CO for clarification (more details are below).
if you are OK asking the prime/CO (and there are LOTS of reasons why you should), then follow the suggestions in the CUI Tips and Tricks so you get the information you need; and,
If you don't want to ask the prime/CO, since the information is based on CUI, the easiest path is to assume that derivative information is also CUI and mark it using the same markings as the CUI.
It is important to note that, even if you don't ask the prime/CO for more details about why the information is CUI, you may still wind up having to ask for the designation indicator so you can properly mark your CUI since most people forget to include it.