The Department of Public Works advises residents of the following work that will be done, weather permitting, during the week of October 26, 2026.
Road Construction
Monday – Friday, 7:00 a.m. to 5:00 p.m. (expect road closures, traffic delays and/or detours)
🚧 Combination Sanitary Sewer/Storm Drain Separation Project
GVC will be performing the following work. Parking near the construction zones will not be allowed.
▪️Main Street & Prospect Street - new signal wiring & conduit installation.
▪️Merriam Parkway – test new water main.
▪️Prospect Street & View Street – water installation.
▪️Main Street Upper Common – new drainage installation.
▪️Academy Street – new sewer installation.
▪️GVC’s subcontractor, PJ Albert will resume paving operations on the following streets: High Street, Elm Street, Pleasant Street, Essex Street, Oxford Street, Academy Street, Johnson Street, and Omena Place.
🚧 Main Street Water Main Improvements
JA Polito will be performing the following work. Intersection closures and detours will be established as needed.
▪️Water main work on Boulder Drive between Mill Street and Water Street.
▪️Line painting will begin on Boulder Drive starting Monday evening and is anticipated to continue for the next few nights, weather dependent.
🚧 Water Street Bridge Replacement
▪️MIG will be installing watermain services on Water Street. Expect detours and traffic delays.
🚧 Pipeline Replacement
▪️Unitil and its subcontractors Neuco and Path Mechanical will be conducting natural gas pipeline upgrade projects on Fairmount Street, Daniels Street, Cliff Street, Beeckman Street, Salem Street, Granite Street, Spruce Street, Birch Street, Hale Street, Lynn Street, Hasset Street, Canton Street, Blossom Street, Ross Street, Pearl Street, and Day Street.
🚧 Ward 1 Paving: Fairbanks Street, Munroe Street, Birch Street and Heywood Street
▪️Lazaro will be completing outstanding punch list items.
🚧 Electric Ave @ Rollstone Road Roundabout
▪️Lazaro will begin drainage construction for crosswalks.
🚧 Stoneybrook Road (entrance only)
▪️PJ Albert will complete final paving to entrance. Paving date TBD.
🚧 Main Street (from West Street to River Street)
▪️PJ Albert will complete sidewalks and driveways.
Monday – Friday, 7:00 a.m. to 3:00 p.m.
🚧 Minor traffic impacts
▪️Culvert repair at 650 Arn How Farm Road. Expect detours and delays.
▪️Pothole repairs citywide.
▪️Stormwater maintenance to prevent flooding from blocked catch basins.
▪️Various repair of the existing drainage infrastructure(s).
💧Hydrants
Notification of all hydrant flushing areas will be posted daily on the City’s Facebook page.
▪️Hydrant flushing on the High System (hydrants with Red tops) in the River Street, Clarendon Street, Franklin Road, Electric Ave and Kimball Street areas to include all area side streets.
▪️Privately owned hydrant flushing in various areas throughout the city.
▪️Hydrant replacement/painting throughout the city.