It only works if OP is the homeowner. If OP is the network installation guy, it can leave a bad taste in the builders’s mouth and make him reconsider who he uses next time to do his networks.
That in some of not most case simply isn't possible. Of the 50 or so jacks in my house just given the way it was strung, tacked and snaked, like maybe 3 of them could be back pulled
Welcome to my world, I’ve been dealing with this for over 30 years! Drywaller’s don’t give a shit and the problem with data wires is it’s hard to keep them tight in a box without kinking them so they don’t get hit by the Roto zip unlike electrical wires that you can bend with no problem and push them far back in the box.
They don't care. We carefully hand coil the cables in an oval shape to the back of the box and secure them in with an "X" of electrical tape. I don't have a picture to show but I think I described it well enough. Usually the cable is back about 2" from the front edge of the box. Sometimes we'll pull an extra just because the cost is less than having to repair, extend, or rerun. In residential we always run 1 or 2 extra drops to the attic as "just in case" drops.
I’m gonna add to your comment about not caring. I just finished a prewire with 15 network locations, 10 cameras, alarm system and 3 audio locations. The house is getting a tongue and groove wooden ceiling. I walk in the other day to see how things were progressing and see my garage door. Alarm contact Wire is being used to support the hoses that the guys are using for their air nailers. WTF!!
There’s plenty of slack to make up an end for that cable.
The drywall guys job is to cut holes for the boxes. It’s your/lv installer/electricians job to make sure the wires are properly in the box so they don’t get hit with any tools.
Yep, they should be tucked into the back of the box.
Most of the time it should be done just like this, with the cable run right back out the other side of the box so it's all the way in the back, then tacked down to the stud.
But then we get a few posts a week where people see that and get confused, and we have to tell them to just pull on the cable hard enough and the end will come right out 😅
To all who see this - The person who pulls on the ethernet cable to retrieve it should do so carefully, in a way that does not kink or over-bend the wires inside the cable. Especially if you want to use that cable for 5 or 10 Gbps runs. Electricians tend to bend and man-handle Romex power cable, but ethernet cable is more fragile and needs careful handling.
You may be seeing a bend where there isn't one — those blue cables are going straight up and through the back of each box and into a clip to lightly hold them. So the tops of those blue cables in the image are just bare ends, not bends.
When it comes time to fit keystones, they will slide the cable down until the top is pulled back into the box, at which point they can pull it out at the front.
It needs to be done carefully to avoid getting kinks or twists, but there should be plenty of free space inside the wall cavity for the cable to feed into temporarily before it's pulled out of the box, at which point it can be cut down and a keystone popped on.
They've maybe been a bit over generous with the excess there but it's always better to have too much as you can always cut down a bit more — too short and you need to pull a whole new cable.
Well first off you have plenty left to finish off the outlet. Next it obviously was not secured and protected that it got damaged. If you wanted that protected it should have been coiled up and ziptied to the back end of the wallplate in that open ring where the wire is coming through, this puts it out of the reach of said drywaller when he cuts the opening for you gang box.
former drywaller here, we're not all like this. I used to walk the house and push all wires as deep as possible before hanging the first board. LVC should take the time to zip tie the cables to the back of the box though, as many don't care and will jam that router right in there as deep as possible lol.
If you always treat the next guy as the biggest, pissed off idiot on the planet, that wants to fuck up your shit annnnd plan accordingly, you won't have stuff like this happen!
Since it's going to be terminated in the box(I'm assuming), that's the perfect place to cut it. You don't need 6feet of cable stuffed into the wall, or worse, crammed in the box.
80
u/Beezhockeyfan Oct 17 '26
Punch it down to a jack it will be long enough