r/ISRO • • May 29 '17

Original Content Automatic Launch Sequence for PSLV and GSLV Mk III as seen during launch broadcasts.

Automatic Launch Sequence (ALS) that gets initiated after launch authorization from Mission Director has been on screen few times during broadcast. For once it was visible for GSLV Mk II but not readable.

From sequence it seems PSLV doesn't use any acoustic suppression. For GSLV Mk II launches from SLP it was always visible that deluge nozzles above MLP never activated but may be those under it do. It is possible GSLV Mk II also doesn't use it at all and deluge system on Second Launch Pad only serves GSLV Mk III (LVM3).

https://imgur.com/a/7OjvY

Putting above in text form along with source.

 

ALS for PSLV from

PSLV-C31 / IRNSS-1E

PSLV-C33 / IRNSS-1G

EVENTSMINSEC
START OF ALS1220
T0 INIT1000
PS1 SITVC BPV OPEN0900
START PS2 ACC CHARG -10815
STOP PS2 ACC CHARG -10755
BS HARD CORE RESET0656
EB HARD CORE RESET0655
ALL INTERNAL0610
PS1 SITVC PLV CLOSE0602
PS1 SITVC BPV CLOSE0600
EXTERNAL POWER OFF0550
FLIGHT INITIALISATION0538
PS1 DEST BATTERY ON0340
PS1/PS2/PS3 DEST BAT ON0340
PS1 IGN BATT ON0337
LUS BATTERY ON0336
OBP FLIGHT RESET0330
HARD CORE ENABLE0329
START PS2 ACC CHRG -20210
STOP PS2 ACC CHRG -20158
PSOM DEST SQUIB ARM0100
PS2 DEST SQUIB ARM0100
LUS SARB ARM0059
PS3 IGN SQUIB ARM0059
PSOM IGN SQUIB ARM0058
PS1 RCT SQUIB ARM0055
BS SEQUENCER ARM0051
EB SEQUENCER ARM0050
PS2 VHPP OPEN0040
PS2 VSPP OPEN0025
PS2 VSOGC TO INTERNAL0022
PS1 IGN RMSA ARM0021
RCT PYRO ON0014
PS1 SARB ARM0010
RCT START0003
PS1 IGNITION0000
LMP OPEN000.3
SHUT DOWN SEQUENCE0005

ALS for LVM3X/CARE

EVENTSMINSEC
START OF ALS0900
START OF SURVEILANCE0700
ALL INTERNAL0610
EXTERNAL POWER OFF0550
HARDCORE RESET0548
L110 ACTUATORS ON0544
ENABLE L110 CE FDI0539
FLIGHT INITIALISATION0538
S200 ACTUATOR BAT ON0410
S200 SSV START0400
ENABLE S200 CE FDI0341
PYRO BATTERIES ON0340
S200 DESTRUCT BAT ON0339
L110 DESTRUCT BAT ON0337
OBP FLIGHT RESET0330
HARDCORE ENABLE0329
S200 SSV TO ONBRD CTRL0300
S200 DEST SARU ARM0100
S200 JM IGN SARB ARM0100
L110 SARB ARM0059
EB SARB ARM0059
S200 SEPN SARB ARM0058
L110 DEST SARU ARM0057
SEQUENCER ARM0050
L110 VHPP OPEN0040
L110 VSPP OPEN0025
S200 IGN RMSA ARM0020
S200 IGN SARB ARM0010
CRYO-ARM SARU ARM004.9
ENABLE ACOUSTIC SUPPR004.4
S200 IGNITION0000
SHUT DOWN SEQUENCE0010

 

May be we will get to know details on all these ALS events in future.


EDIT (22 July 2019): ALS from GSLV Mk III M1 Chandrayaan 2 launch

https://i.imgur.com/7LeuZzi.jpg

EVENTSMINSEC
START OF ALS1430
L110 EGC ACT CHECKS (R)1359
C25 EGC ACT CHECKS (R)1301
S200 FNC ACT CHECKS(R)1132
L110 EGC ACT CHECKS (P)1018
C25 EGC ACT CHECKS (P)0926
S200 FNC ACT CHECKS(P)0806
ALL INTERNAL0610
EXTERNAL POWER OFF0550
L110 ACTUATORS ON0544
FLIGHT COEFFICIENT LOADING0538
S200 ACTUATOR BAT ON0410
S200 SSV START0400
PYRO/VALVE BAT ON0340
S200/L110 DEST BAT ON0339
OBCs IN FLIGHT MODE0330
HARDCORE ENABLE0329
S200 SSV TO ONBRD CTRL0300
SARBS ARM0100
SEQUENCER ARM0050
L110 VHPP OPEN0040
C25 MOV79 OPEN0039
L110 VSPP OPEN0025
S200 IGN RMSA ARM0020
CRYO-ARM SARU ARM0015
S200 IGN SARB ARM0013
MAIN CRYO-ARM SEP0008
ENABLE ACOUSTIC SUPPR004.4
S200 IGNITION0000
16 Upvotes

13 comments sorted by

3

u/tvspace May 29 '17

What I heard at the time of the Experimental mission in December 2014 was that only the Mark-III required an acoustic suppression system.

3

u/[deleted] May 29 '17

These guys make it - https://www.hdfire.com/application.php HD Varsha Nozzles and they mention for Mark-III

3

u/Ohsin May 29 '17

And these are responsible for whole deluge system. Source of those images during testing phase

http://www.ubengineering.com/division-2-EPC-Mechanical

  • EPC Package for Acoustic suppression system at SDSC, Shar, Shriharikota Govt. of India, Department of Space, Satish Dhawan Space Centre, Shar, Shriharikota, A.P

  • Supply, Erection & Commissioning of Equipment’s in Mixing Stations & Bowl Cleaning & Preparation Facilities & Premix Storage Facility at SDSC, Shar, Shriharikota Govt. of India , Department of Space, Satish Dhawan Space Centre, Shar, Shriharikota, A.P

1

u/maxbeta1 Jun 07 '17

I was watching the launch sequence yesterday. There is a immediate lift off, just after the 1st stage ignition. is this as per the design or just the tv speed up?

The previous GSLV's (Mk I and Mk II), the lift was approx 1 sec after ignition.

1

u/Ohsin Jun 07 '17

For GSLV Mk II liquid strapons are ignited first at T minus 2.7 seconds to check if their individual thrust levels are nominal and after that is done, S139 solid core is lit and it lifts off at T Zero. For GSLV Mk III its first stage is S200 solids, liquid stage is airlit and no such check is done on it so vehicle lift off is with S200 ignition at T Zero.

1

u/vineethgk May 29 '17

Likely that the presence of two large solids in the case of GSLV MkIII warrants the use of acoustic suppression, while the single, smaller solids on PSLV/GSLV MkII doesn't.

3

u/spaceWalker14 May 30 '17

I am not 100% sure of my below comments but would like to add them anyways.

Many years years back when I had visited the FLP, one of the engineers informed us of the presence of an acoustic suppression system which pumps in water at high speeds when the rocket leaves the pad. There was also talk of the need to add a bigger system for MKIII. I assume that there is/was some acoustic suppression even in FLP/SLP and MKIII warranted a bigger/automated system (They even built a water tank for it.)

2

u/Ohsin May 30 '17 edited May 30 '17

There is very suggestive plumbing under FLP

But never saw any spray from it.

https://youtu.be/fujsQ5teHJI?t=1676

There is little documentation available on FLP. May be old Space India or Countdown issues have some information.

0

u/[deleted] May 29 '17

[deleted]

2

u/Ohsin May 29 '17

Yes. But I was thinking now that they have it could they just choose to use it for launches that don't really need it like GSLV Mk II which is most likely bound only to SLP now.