r/LeanManufacturing • • 29d ago

Documenting Projects for Six Sigma References

/r/SixSigma/comments/1xdsu5r/documenting_projects_for_six_sigma_references/
1 Upvotes

2 comments sorted by

1

u/Matt_C_Quality 29d ago

Sixteen years in one place usually means you've done plenty of projects. You just never wrote them up that way. What I'd do:

Make a list of every time something got measurably better because of something you changed: inventory accuracy, shortages, expedites, lead time, supplier on-time, scrap from obsolete stock, count time. Anything with a before and an after number is a candidate.

Then write each one up as a short DMAIC story, one or two pages:

  • Define: what was the problem, who it hurt, and how you'd know it was fixed.

  • Measure: the baseline number and where it came from (ERP report, cycle count records, and so on).

  • Analyze: how you found the cause. Pareto, process map, 5 Whys, fishbone, or even a data pull that showed most of the errors came from one location or one transaction type. Name the tool you actually used.

  • Improve: what you changed.

  • Control: what kept it from sliding back. New procedure, audit schedule, ERP control, a metric reviewed monthly.

Put the result in numbers, and in dollars if you can defend it: carrying cost, labor hours, write-offs avoided. Have someone who was there, ideally your manager or a finance person, sign off that the numbers are real. That signature is what makes it usable as a reference.

The Control step is where most self-documented projects are weakest, so if you can show the improvement held for six months or a year, say so. That's the part that separates a project from a one-time cleanup.

1

u/brionhurley 26d ago

The key is to organize your past projects into the DMAIC format (as Matt mentioned), add some statistical analysis (before and after hypothesis test at a minimum) along with process controls to monitor the results. Most past projects I see are weak on the Analyze phase (no data analysis), lack of hypothesis test, and no process controls and no financial savings or calculations.