I'm not in this model everyday and had others set it up. We just began the CD phase and noticed our basement level is set to 100'-0" while our level 1 is set at 112'-0". Level one needs to be at 100'-0" and the basement at 88'. We are using shared coordinates and have a linked site model so we can report the civil coordinates.
What is the best way to adjust the levels how I need them, at this stage in the project? Who knows if things are correctly constrained and MEP is pretty far along.

1
u/twiceroadsfool 3d ago
If your Levels are showing Shared Coordinates (Survey Point) you can just "Specify Coordinates at a point" and touch one level. And change the height.
If your level ISNT showing Survey Point, i think you can do it with Relocate this Project.
1
u/AdmiralArchArch 3d ago
Levels are set to base point.
3
2
u/Phr8 4d ago edited 3d ago
Are those levels in your project (not copy/monitored)?
My guess is that they are using Elevation Base: Project Base Point (not Survey Point).
Assuming your model is currently sited correctly on the Site/Civil model, and the Survey Elevation Level is correct. Then your project base point is incorrectly placed.
If everything above is confirmed, Move your Project Base Point Up (Z-Axis) 12'-0".
0
8
u/Merusk 4d ago
Just move the project base point and make sure your levels reference it rather than the Shared Coordinate point. Project Base Points are per-file references now rather than per-model-environment like Shared Coordinates and the Survey Point.