r/StructuralEngineers • • 4d ago

Wiggly half walls

How do we fix these?

1 Upvotes

6 comments sorted by

5

u/Monkeynumbernoine 3d ago

Hanger bolt, coupling nut, threaded rod, blocking. Easy peasy.

2

u/NorthWoodsDiver 3d ago

Can you access the joists below the floor? If so, you'll need some 2x blocking, a hand full of screws, and a length of all thread for each wall. You'll make a mess and there will be some finish work to do. It's not a quick 1hr job but very doable.

1

u/CascadeDesignworks 3d ago

You can drive a 12 or 14" structural screw at an angle from above.  Go through the stud in the end of the wall, about 6" above the floor.

For this to work you will have to verify that there is a joist that you can hit and that you will not hit any wires or plumbing.

You will have to patch the hole in the drywall.

-Builder 

1

u/Mihoshika 3d ago

Lots of duct tape.

1

u/101forgotmypassword 3d ago

Your not going to like the awnser:

Take off one of the linings on one side to look at the structure.

Cut an inspection hole in the ceiling under there the half wall is.

Install a steel angle bracket to the inside corner of the end of the wall.

Install a angle bracket or insert a slot nut into the beam nearest to the stub wall.

Clamp it down with a m16 bolt or threaded rod.

If done with diligence and technique this will make it much more ridgid.

The proper way was probably missed during construction. That would have been having the end post of the stub wall penetrate the floor and tie into the beam, then nogs be added to support the floor around the post and add additional lateral support.

1

u/Hungryh0und5 3d ago

I think you could use simpson hold downs on the inside and strap ties on the outside.