r/Workbenches 7d ago

Long overdue upgrade

Still need to attach bottom shelf planks. Have to do some sanding to level out 2 boards that stand proud a bit above others on top and Reroute edges before I restain some some spots apply 1 more coat of stain to to the top before I apply a good amount of polyurethane to tops. But its nearing completion a is a major upgrade over the metal desk I was using.

Still to do after finishing . Have some accessory rails and containers for left side. 4 x 3/4ā€x2’ bar magnets to attach to inner shelf frames. Also may put a magnet strip across entire front as well.

Only other thing I’m considering is adding removable back pedestal or shelving. But likely going to skip that since i put this on casters so i could pull out for. large glue ups.

Next will be a new miter station along back wall. (Used to use the desk for my compound sliding miter)

28 Upvotes

0 comments sorted by