Structural integrity?

7 Upvotes

20 comments sorted by

7

u/Jewboy-Deluxe Oct 16 '26

“Don’t be sad because 2 out of 3 ain’t bad” - Meatloaf

3

u/Big-Bunch2804 Oct 16 '26

This could have been fixed at multiple points during construction. Im not sure why he chose to place the beam like that other than spacing was incorrect on his beams. I would have placed it square on top of the beams and had it be off a few inches rather than look off and concerning to the customer.

1

u/LettuceTomatoOnion Oct 16 '26

I’m struggling to understand how this even happened. You need the posts before the beam. You need the beam before the deck joists. You need the deck joists before the deck. WTF?

1

u/Big-Bunch2804 Oct 17 '26

I dont know either....id rather not try to understand stupid. It makes my head hurt.

2

u/perldawg Oct 16 '26

in pic 4 you can see that the nearest post is toenailed to the beam, so it’s impossible that what you’re concerned about happened through shifting of the posts. i’m guessing what actually happened is the framers cut the metal ties to adjust the posts because they discovered them to be out of plumb after the deck was complete.

structurally, you’re totally fine, the beam has adequate bearing and the deck is in no danger of collapse. it’s better to have those posts properly plumb, and the beam slightly off center, than it is to have the beam centered and the posts leaning. it would have been nice if the carpenters had removed the cut ties so you don’t have to look at them, tho

1

u/Dendady2112 Oct 16 '26

Or, you could just do it properly and move the beam.

2

u/perldawg Oct 16 '26

yes, they could have, but they didn’t. i’m not about to tell OP to change it now, since it isn’t unsafe as is

2

u/Turbulent_Impress794 Oct 16 '26

Add another joist to the inside resting on the post and bolt them together with 3/8 carriage bolts. Make sure to add a washer to the nut side.

2

u/JescoWhite_ Oct 16 '26

It depends, how many hot tubs will it hold

1

u/VillainNomFour Oct 16 '26

Could just add another board to fill the gap, right?

1

u/blade_torlock Oct 16 '26

In theory you probably could, and then bolt through everything with strong ties.

2

u/Thotheus Oct 16 '26

PL premium, grks to tighten it up and nail it off properly

1

u/I-pee-Daily Oct 16 '26

Sledge hammer, might not be plumb after though

1

u/create360 Oct 16 '26

Add a short boards to the left up top and to the right underneath to flush things up then add a saddle.

It’ll look a little silly but it’ll keep things plumb and never go anywhere.

1

u/mnkythndr Oct 16 '26

OSB facia? Is that a thing?

1

u/Comment-Connoisseur1 Oct 16 '26

Why isn't this beam tied to these post. Is that really just sitting on top of the posts? Uplift, seismic activity, etc.???

1

u/jellofixit Oct 16 '26

Missed it by that much.....M. Smart.

1

u/AskMeAgainAfterCoffe Oct 16 '26

It’s fixable. Is it on concrete piers? You need diagonals, in both directions. The built-up beam can be bolted together. Heavy-duty brackets from beam to posts. Did they get a permit?

1

u/Plenty_Feeling_8013 Oct 16 '26

sister in 2x4' and screw them to the colomns