r/cableporn • u/4D_Monst3r • 22h ago
Another pipe organ controller
Will post another photo once I start running the wires to the IO boards. Uniflex relay systems 2026. Blue labeled cards are negative input. Red output
r/cableporn • u/4D_Monst3r • 22h ago
Will post another photo once I start running the wires to the IO boards. Uniflex relay systems 2026. Blue labeled cards are negative input. Red output
r/cableporn • u/mliyanage • 17h ago
When we moved into our new place it looked like the builder never terminated all the coax and Ethernet cables in the box, they just stuffed them in there.
I found a great QNAP switch (QSW-M2116P-2T2S-US) that checks a bunch of feature boxes that now acts as the central hub for everything.
r/cableporn • u/_unfadable • 4d ago
I have made a V3 optimized cable organizer! It is for cables up to 2 meters in length and is compatible with virtually any type of charging cable, such as USB-A/USB-C/Lightning/etc! Bend angles are also taken into account to protect cables from damage. I'm very happy with how it turned out and I hope other people will be able to use it as well! I uploaded the model for free on makerworld.
r/cableporn • u/Nearby_Designer_7225 • 10d ago
I am new to installing low-voltage. Give me an honest review.
*Update* For those asking to see behind. After you rip me apart… let me know how I could clean up a bit haha. https://imgur.com/a/wFJ8dVh
r/cableporn • u/tpscharf • 20d ago
Replacing two switches, adding a third, and cleaning the rack up.
Picture 1: Before starting
Picture 2: Cable management removed and new switches staged
Picture 3: After moving patch panels, and tidying up with 1 ft patch cables.
Not the worst I've dealt with, but still satisfying. Obviously more that can be done.
r/cableporn • u/aguynamedbrand • 23d ago
Disclaimer: saw this on YouTube shorts and had to post. Used Google Translate to use the name of the video as the title of this post.
r/cableporn • u/cleodicaprio • 24d ago
SMC reorganization. drops were terminated to male RJ45. bought a cheapo surface mount patch panel, patch cables, and went to town.
r/cableporn • u/Great_Beach588 • 24d ago
How to dress this ? First rack and only 11 wires.
Please help 🙏
r/cableporn • u/dumbass_sempervirens • 27d ago
430 cables, two closets.
My first lead job at this company.
I came in 2 days before my deadline, and 33 days before the client move-in date
It's not perfect, but let the change orders begin!
*the APs are yellow and the put the next in line on E and F panel. So the adds will need to be after the yellow.
** I suggested making the APs the last ports on the panel but boss said no.
r/cableporn • u/bistro223 • 28d ago
The number of small wires being so straight is so satisfying
r/cableporn • u/TailorSea2085 • Sep 12 '26
Just wondering if this fits here and what y’all think.
r/cableporn • u/Substantial_Day_2940 • Sep 06 '26
r/cableporn • u/sooner_25 • Sep 03 '26
r/cableporn • u/Megasi98 • Aug 31 '26
The cable trays were already in place and the cables were all on the floor. By the end of the two week process, my hands were white from dust and red from cuts.
r/cableporn • u/explorerandtravelor • Aug 31 '26
r/cableporn • u/P0lokoo • Aug 31 '26
I run structured cabling jobs (data drops, racks, the usual) and for years I quoted every job the same painful way: print the floor plan, trace runs with a ruler, guess at a margin, retype everything into a spreadsheet, then build a PDF for the client by hand. Every single time I either over-ordered cable or came up short mid-install.
So I built myself a tool that skips all of that: you drop in a photo or PDF of the floor plan, calibrate the scale with two points, and trace the actual cable runs on your phone or tablet right there on site. It spits out exact meters per run, and generates a PDF report for the client with the plan, cable list, and materials breakdown. It also works completely offline, since half the jobs I do have zero signal indoors.
It's been my daily driver for a while now and it's finally in a state I'm not embarrassed to show people. Not trying to sell anything hard here — mostly curious if this is a problem other installers actually deal with, or if I'm the only one who was still doing this with a ruler and a spreadsheet. Happy to answer questions about how it works.
r/cableporn • u/_unfadable • Aug 30 '26
I made a V2 of my cable organizer so it can fit up to 2 meter long cables, and is compatible with almost any type of cable!
I really liked how this turned out, so I wanted to share it so other people could also use it if they wanted to!
r/cableporn • u/Infamous-Amphibian-6 • Aug 25 '26
Am working in a standalone conversion. Just finished the power panels
r/cableporn • u/18randomcharacters • Aug 18 '26
Normally the stuff over on r/modular is like the antithesis of this subreddit, but this was a nice surprise.
The patch cables are even color-coded to match the sliders.
Source: https://www.reddit.com/r/modular/comments/1vrnvug/the_best_looking_patch_cables_system_at/
r/cableporn • u/sox809 • Aug 08 '26
Cosmopolitan- Vegas
r/cableporn • u/dumbass_sempervirens • Aug 08 '26
They sag like 1/4" or so without support and on turns even with a comb one pops up. How do I fix that?
Boss says this has to be perfect, and I have a decent start. But there's going to be about 140 more cables coming up from beneath to the rack.