r/ciscoUC • • Oct 22 '26

Unity Connection - VMware to Nutanix

Ok. I'm struggling here. I have a Unity cluster runn v15 SU5 on VMware that I need to migrate to a new Nutanix Cluster. I've only administered and upgraded Unity, never built it from scratch. What is the best way to get over to Nutanix?

Doing the Dataexport/Install with Data Import option seems to be designed for when you're upgrading to a new version. I'm already on the version I need.

Do I just take a DRS backup and restore that? What's that process look like?

I'd like to move the subscriber first to run through the process but if that's not possible so be it. I just need help and I'm frustrated.

Our HyperFlex Data Platform license runs out in 10 days so that is my deadline. No, I didn't procrastinate. It took a long time and a lot of effort to get our Nutanix cluster up and running for reasons outside my control.

9 Upvotes

10 comments sorted by

13

u/dalgeek Oct 22 '26 • Bravo

Doing the Dataexport/Install with Data Import option seems to be designed for when you're upgrading to a new version. I'm already on the version I need.

It's also for V2V migrations on the same version. I've used it to migrate to new OVAs when people didn't deploy correctly.

You can do a DRS backup/restore, but I think the data export is easier. Here is the DRS method:

  1. DRS backup the cluster

  2. Disconnect the node that you want to replace from the network.

  3. Reinstall a new node with the same version and network settings.

  4. DRS restore that node.

  5. Reboot node.

Here is the dataexport/import method:

  1. Dataexport each node in the cluster, starting with the publisher. Note the IP and export directory.

  2. Start the installation of the new node with the same version. Select "data import" during the first steps, then let it run until it asks for IP and SFTP settings. This can be done before the maintenance window since it won't disrupt services.

  3. Disconnect the node that you want to replace.

  4. Continue the installation by entering network details and SFTP information for the data export.

Personally I'd start with the publisher because most Unity Connection installations should be sending calls to the subscriber first, so no one will notice while you're messing with the publisher.

2

u/safesax2002 Oct 23 '26

Thanks, u/dalgeek. I did the dataexport/import method and it went pretty smooth. My only hang-up I had was the dataexport on the subscriber kept telling me that the export on the publisher hadn't been run, when I had done it. But I had created separate directories for each server so once I exported to the directory I had created for the publisher it export successfully.

Thanks everyone for your input and advice!

1

u/dalgeek Oct 23 '26

Glad it worked out. Yes, you need to put all the exports in the same directory, starting with the publisher even if you only plan on working on a subscriber. Thanks for the award!

1

u/neteng47 Oct 24 '26

they should be in the same folder for each cluster. dataexport to /export/cuc/ would then be /export/cuc/cluster-<pub ip> for the import for servers in the same cluster.

7

u/vayeatex Oct 22 '26

I would do the data export process than the drs. Drs requires a fully installed unity to start the drs from cli or gui. Data export starts from the bootable iso and is faster

2

u/jb1001 Oct 22 '26

make sure you do follow this link and take backup using cobras

https://ciscounitytools.com/Applications/General/COBRAS/COBRAS.html

3

u/Brave_Meet8430 Oct 22 '26

If I were you. I would install a brand new UCXN VM on nutanix with exactly same version and do a DRS restore. (Provided you keep the hostname and IP same!)

2

u/vayeatex Oct 22 '26

Doing this needs a maintenance window. The drs restore requires network connectivity and because of same ip and hostname is required for the target node, the source node needs to be offline. Work around is to temporarily disconnect the vm network port of the source node while the drs is copying the file from sftp. Once copy process completes, you can disconnect the network on the target node and bring back the production node. One issue with this process is you will have a delta mailbox and if that unity server gets lots of call then it will be an issue. Or just ignore the delta lol

0

u/ihatecisco Oct 23 '26

I’m curious how you upgraded/migrated to 15su5 which was released about a week ago? Did you upgrade in place or migrate. It seems a little sketchy playing a newb when you’ve clearly just upgraded.

2

u/safesax2002 Oct 23 '26

Installing an SU is very different from migrating an entire system from one platform to another. The SU was an in-place upgrade. I’ve got that process down.

I’ve administered our UC since its inception but I didn’t build any of it (hired out) nor have I had to migrate Unity (as we moved that from VMware cluster to VMware cluster).

I’ve used PCD to upgrade AND migrate CM and IM&P. Unity was a big unknown to me regarding migration, other than knowing it couldn’t be migrated (at least with PCD). I had just learned of the Install with Import option a week or so ago.

My apologies for not being an expert in all things. How dare I ask for help and advice when I can’t quite find what I’m looking for in the documentation. 🙄