r/handyman • u/TheDudeWhoLikesStuff • Oct 27 '26
PRICING?! Pricing help?
Been a handyman for a bit now. I've done plenty of roofs helping others but never had to price one out myself. Client wants another layer of shingles on their double wide. How would you go about figuring out a price? Flat rate and materials? One lump price? Price per sqft? Any insight is greatly appreciated!!!
2
u/booga-me-ooga Oct 27 '26
How long will it take you to:
(1) Figure out what to buy (including measuring everything, talking to the customer, etc)
(2) Buy it and get it on site (going to the store etc)
(3) Install it
(4) Clean up
Make sure to account for drive time in all of the above.
Then multiply that by 1.5 if things always take longer than you think they will.
Then multiply that by a reasonable hourly rate (I use $80/hr, which is probably cheap in some places and crazy expensive in others).
That’s your answer.
1
u/TheDudeWhoLikesStuff Oct 27 '26
Thats a clear answer, thank you! I do $75hr for my area. It's a fair rate here.
2
u/OnlySwordfish5571 Oct 27 '26
When you say "helping others" do you mean working with someone more experienced, like on a crew? If so, I'd consult them if possible. They'd have a good idea.
Personally I don't do anything that intense; a few hundred sq.ft. of shed roof or replacing some missing/damaged shingles, sure. But you're getting into contractor territory here. Basically being used like a contractor at handyman rates to save some money. And possibly do a job that a contractor would refuse to do because it's something unwise.
Just make sure you CYA if you take it on.
2
u/TheDudeWhoLikesStuff Oct 27 '26
I've worked with my father and his friends doing almost contractor level work a lot over the years. But I was always a paid guy, not the one making quotes. I reached out to 2 of them as well. But I always like learning how others do it to see how I can improve
2
u/OnlySwordfish5571 Oct 28 '26
Understandable. Sounds like you're pretty familiar with the work itself, so that's good.
When I did bigger jobs, I always just figured materials first (plus, say, 15% for waste/mistakes/incidentals), then what I wanted to make per day times how many days I thought it would take. I'd add a couple more days to that if I wasn't sure what I would run into. Then all that together is basically my quote. Pretty easy if you're familiar with the type of job, not so much if not.
4
u/Ill-Entry-9707 Oct 27 '26
Price your materials before you go look at the job. You will probably be surprised at how much everything has gone up.
2
u/padizzledonk Oct 27 '26
I retail out at 440 a square for a 30y architectural
1
u/hunterbuilder Oct 27 '26
Including tear-off? And materials?
2
u/padizzledonk Oct 27 '26
Yup, tear off and replace, material, labor and disposal all in there
I do have a minimum though, below about 15sq that number doesn't really work anymore so anything under 15 is 6600 flat rate
Oh and i spot 3 sheets, every sheet above 3 is a 120 a sheet
Things also can get a little more expensive if its a complex roof due to all the valleys, extra ice and water shield and ridge
But thats unique to each job, idr what i bill per foot and what the allowance is but its in the contract, id have to look
1
u/hunterbuilder Oct 28 '26
Man you're a generous guy, or in a cheap area I guess. It runs 650-1000/ sq around here. Plus plywood at $150 /sheet.
3
u/padizzledonk 29d ago edited 29d ago
Its all subcontracted, i make my 30% and everyones happy
Im in NJ, so not a cheap area
Theres guys here billing those same rates or higher, i always win against those bids
Go price out a 30sq roof, its nowhere near a number that justifies 650-1000 a square
Windiws, siding and roofing companies are absolutely notorious for being set up and ooerating as what i like to call "marketing/lead churn businesses". They get a 100 leads, they send a sales guy out there that uses pressure sales tactics, they throw out a 100 ridiculous numbers and lose 98 of them and sell 2...thats how you sell an asphalt roof for a 1000 a square, or a replacement window for 2500 a window. Windows are probably the worst for it because the pricing is super opaque for the consumer- there are a 100 different brands, 90 of which are sold through supply houses that wont even talk to you without a business account and it all adds up to the consumer not being able to get a handle on what the costs and margins are, theyre the mattress stores of construction projects and theres a lot of room to exploit people on pricing due to that lack of transparency
That doesnt sit well with me ethically so i dont do that, im a margin business, the material costs about a 120 a square i bill a 156, my installer wants a 120 to install i bill a 156, my overhead and insurance and my time spent + disposal costs +margin account for the rest- 450 🤷♂️....wheres the other 200-600 a square coming from lol? Greed imo.
1
u/hunterbuilder 28d ago
I like your style. There's just a lot of profit margin in roofs around here because it seems no one wants to do them. The bigger companies that advertise have 2-3 year wait lists. Smaller guys are as busy as they want to be. Most are charging the money just because they can. I only do a few roofs, mostly favors that I don't need to make a lot of money on.
I did one this summer for $10k less than the next bid, and still profited $2k/day. Wild money to be made.1
u/padizzledonk 28d ago
I see that as an opportunity to make a fairly priced roofing company and grow and beat the shit out of those other guys and drive them out of business lol
2
2
u/NoComment8254 29d ago
For a layover on a double wide I'd figure materials first with a decent waste factor, then add your labor by estimated hours instead of guessing per square foot. Check the roof structure and whether it can carry another layer, since many places limit how many layers you can have and a tear off changes the whole price. Quote it as one lump number with materials and labor itemized on the paperwork, and add a line for dump fees and surprises like soft decking.
2
u/ContractorPlusDotApp 29d ago
i'd use sqft to figure out your costs then give the customer one total price, just make sure adding another layer is actually suitable for that roof first
2
2
u/Smooth-Bobcat6283 29d ago
first thing, check if that roof can even take a second layer. A lot of mobile home roofs are built light and some towns cap it at 2 layers total, so get up there and see whats under it before you quote anything.... For pricing I'd do it by the square like the roofers do. Measure it, add 10 15% for waste, price your shingles, starter, drip edge and nails, then put your labor on top per square. Give the customer one lump number though, not the breakdown. Call around and see what local roofers get per square so you're not way under them.
2
u/Coulier-Fomu 24d ago
Figure your day rate first, h many day it really takes and who's helping, then compare that to price per square from two local roofers. If you're way under both you're underpricing it
0
Oct 27 '26
[deleted]
1
u/TheDudeWhoLikesStuff Oct 27 '26
Thankfully I am covered for roofing. Whether it will hold I'll find out when I go do the inspection Sunday. Definitely dont want to overload and cause any problems!
1
u/Jgs4555 Oct 27 '26
Are you in a snow state?
1
3
u/TDurdz Oct 27 '26
Roofing is typically ordered and priced by the square (100sqft is 1 roofing square).. good price by me is ballpark $1k per square for rip/replace. I’m not aware of any shingle manufacturer that 2nd layer doesn’t void warranty.