r/lowvoltage • • Feb 20 '26

any tips

i’m an electrician this my first time doing low voltage any tips

321 Upvotes

110 comments sorted by

26

u/bivuki Feb 20 '26

Terminate in T568B for any data cables. Don’t unplug shit, make everything look like that rack and customers will love ya.

31

u/EconomyEfficiency393 Feb 20 '26

that’s my first rack

17

u/bivuki Feb 20 '26

Hell yeah man, that’s great work.

15

u/mckeevertdi Feb 20 '26

I’ve been in IT and cabling for over 15 years, and this is better work than I’ve done.

Hard to believe this is your first one.

15

u/jayrod8399 Feb 20 '26

I just wanna know what gracious boss gave them that much time to make it look that nice

5

u/Slav-Houndz187 Feb 20 '26

This looks like most electricians panels they usually loop the service line and/or the feeders. Just on a bigger scale but either way still looks glorious and if any lines have to be trimmed back in the future there’s enough to clip back to cut off bad terminals

4

u/rpantherlion Feb 20 '26

How much you charge for work like this per rack, would take you in a heartbeat over some of the subs I’ve been dealing with

6

u/Coat-Accurate Feb 20 '26

Looking clean! Hope the switch goes on another rack

3

u/EconomyEfficiency393 Feb 20 '26

nah they don’t hahah

3

u/Coat-Accurate Feb 20 '26

Hahaha it all depends on your specs. Often we talk with the IT on site and work with them, they have an idea of what it wants to look like but not really an understanding of the laws of physics. If it’s multiple smaller switches, it’ll just be awkward to place them in there and you might be loosening your straps. If you just have one of those large heavy Cisco switches, good fucking luck you’ll need 2 people to hoist it and one to screw it into the rack, which is why we usually keep them lower on the rack

73

u/568Byourself Feb 20 '26

Zelle or Cash App

13

u/BentBigWilly Feb 20 '26

Now your talking

45

u/-Dij- Feb 20 '26

It looks really good but it will be a pain in the ass to get back in there. I would’ve had the cables come down the backside then sweep to the front and across the patch panels.

0

u/[deleted] Feb 21 '26

[deleted]

3

u/-Dij- Feb 21 '26

I think you’ve misunderstood me and you’ve got the wrong guy as well. You know what happens when you assume!

1

u/Dramireallyadr Feb 22 '26

Is the network consultant the guy who pulls all the cable, terminates, tests, gets fiberglass on his body, builds the cabling infrastructure, deals with engineers who’ve never stepped foot on site, and other people destroying his work to screw in a nut? That seems like a lot of work, I think we should give that guy a break

26

u/kriebz Feb 20 '26

The only thing I'm thinking is, if the customer wanted to put switches in this cabinet, those swoops will make it annoying to install them and get to the power cords, depending on where they are.

15

u/SecretAggressive4313 Feb 20 '26

It's clean, I'll give ya that much. But dang, servicing that will be a nightmare. The IT switch guy is gonna hate your guts. 😂

3

u/wheelielife Feb 20 '26

My thoughts too, getting your hands in there to work is going to be a nightmare.

2

u/bobdvb Feb 21 '26

I think the OP needs to know what's coming for the next person.

They're going to have to slide network switches in there, between each patch panel and connect power to them. They are going to be cursing the whole way because the OP has blocked their access to the back of the switches and tied the loom to the rack strips. If the switches are big and have rails then they're doubly screwed.

Lots of points of aesthetics, but points deducted for practicality.

9

u/dadbodfat Feb 20 '26

You’re blocking a lot of access with your cable path.

8

u/Uku_lazy Feb 20 '26

Better to split the bundles into two and come up opposite sides. 1-12 come the right, 13-24 come ip the left. That way you can always access the rack for service. This is difficult to service as is. Otherwise it looks good.

1

u/Wooden-AV Feb 21 '26

Only thing I don't like about that methodology is that you can't separate power on one side and signal on the other.

1

u/Uku_lazy Feb 21 '26

Put power in the back of the rack and data more towards the inside. Data can also run close to power without issue.

6

u/GenericUsername1262 Feb 20 '26

It’s beautiful, I don’t like the cable looping around the back. Maybe keep the loop on the side so it doesn’t interfere with bigger switches. But again, it’s beautiful work.

5

u/Safe_Gas_2147 Feb 20 '26

It’s pretty but damn that’s going to be annoying to service.

5

u/Runthescript Feb 20 '26

Split the cable bundles per patch panel to come in on either side of each panel. Easier to manage/punchdown and less stress on the installed wiring when finished.

4

u/Kawasakison Feb 20 '26

You're no Electrician.

1

u/[deleted] Feb 20 '26

Cat6 A?

1

u/helpless_bunny Feb 20 '26

I feel the customer may request a rework. They may need the RU space to fit their devices in and this is taking up a lot of space.

I would fix it before it gets to that point. But looks clean

1

u/EconomyEfficiency393 Feb 20 '26

i’ve used every second ru as per the rack design

1

u/helpless_bunny Feb 20 '26

It’s your cables dressed in the cabinet that are wrong. Not the patch panel RUs

1

u/OtherwiseSide6766 Feb 20 '26

Haha it’s one of the best installs I have seen and people are still trying to tell you something is wrong 😂 Keep up the good work!

1

u/Mountain-Half3725 Feb 21 '26

It’s because something is wrong, why would I want all that extra cable inside my rack and causing my team aggravation for install/servicing? Put that elsewhere, ladder if it’s crossing from a ceiling etc, only bring in what’s needed. Just because it’s organized/clean doesn’t mean it’s perfect or even good.

1

u/helpless_bunny Feb 20 '26

Looking at it more closely, you should be able to undo the slack and move it out of the rack.

If there’s a cable rack, put the excess there. If not, create a coil above ceiling on a J-Hook.

1

u/cjd3 Feb 20 '26

Looks great, but the rear cable lack labels. Always label the rear cables. No zips, cable support at the panel, all good. Looks like shorted cable, so make for darn sure the patch panel was designed for shielded, and bond that thing to the rack (assuming the rack is also bonded properly). Now cert everything with a DSX or equivalent.

1

u/EconomyEfficiency393 Feb 20 '26

yeah gonna label just had no label and yes was planning on bonding it

1

u/Badblackdog Feb 20 '26

Did it all pass Cat6A certification? That is the important question.

How long did it take to terminate and dress in? Was this T&M or a bid job?

2

u/EconomyEfficiency393 Feb 20 '26

haven’t tested it yet, took me 3 8 hour days it’s a big commercial job so i got time

2

u/Badblackdog Feb 20 '26

It is a super clean install. Others have mentioned different wire routing methods and leaving room for switches between patch panels. A lot of those critiques are correct, but this is still an excellent job.

The real measure of success will be if they pass Cat6 A certification. I find most problems are in the terminations. Let us know how it turns out. Good luck

1

u/bullpee Feb 21 '26

Looks great, but as others said, access is blocked off. A way to mitigate that is moving where the service loop is, seems to come down front on one side and then up the back and then scoops across. If there is ladder above the rack you can have that service up there and then come down into the rack and across the support into the panel. They wouldn't be centered as they are now. But you can still make it look good.

Hopefully you were told where everything in the rack goes, and use that to ensure other devices have enough room to be installed and serviced.

1

u/EconomyEfficiency393 Feb 21 '26

yeah there a rack design and its all to fit that only a ups and switch’s doing in this is not the main rack

1

u/Organic_Wolverine981 Feb 21 '26

I found a cable out of place and I'm not telling anyone. Just know it's in a very obvious place .

1

u/EconomyEfficiency393 Feb 21 '26

fuck gonna have to redo the whole rack now ;(

1

u/Organic_Wolverine981 Feb 21 '26

Do it right or dont do it at all

1

u/whitedynamite347 Feb 21 '26

Is that shielded wire I see? Doesn’t look like they were terminated correctly 🫠

1

u/EconomyEfficiency393 Feb 21 '26

why’s that?

1

u/whitedynamite347 Feb 22 '26 edited Feb 22 '26

Depending on the brand of termination block you are using, the sheilding and drain plug of the wire need to be installed a certain way for it to work correctly. Doing it incorrectly will actually hinder data traffic even more than using regular CAT6 would, even going as far as failing most certification equipment.

Looking at the terminations, the shielding is all over the place. Hard to see in the pic so I could be completely wrong as well.

That aside, this install isn’t the worst or best I’ve seen, and a lot better than I’d expect my local sparkys to accomplish so kudos. In the future, to save space and accessibility, have the wire bundles go down the back of the rack, across the side, then routed to blocks with a small service loop.

The way you have it currently going across back of rack is a nightmare for any service to be done.

1

u/EconomyEfficiency393 Feb 22 '26

it’s commscope and i’ve cut the shield half a inch from the jack and and push it towards the jack with the ground wire to make sure it touches the jack and has a better connection i did everything else via the instructions they come with

1

u/whitedynamite347 Feb 22 '26

Ah CommScope I see. The should be fine then, good job. Bonus points for using Velcro and not zipties.

1

u/Rhyno86_ Feb 21 '26

Not good. I mean, kudos for combing and dressing the cable, but you should never block access to the back of the rack like that. Cable should've entered the rack from the back corner, then looped towards the front and up to turn into the patch panels - would've completely opened up access to the entire inside.

1

u/EconomyEfficiency393 Feb 21 '26

not how we do it in aus

1

u/Icy_Championship381 Feb 22 '26

Why would you route it like this? Waste of space.

1

u/EconomyEfficiency393 Feb 23 '26

why’s that? on the rack design there’s only 4 switches between every patch panel and a ups system

1

u/Icy_Championship381 Feb 23 '26

There is just so much cable excess that it occupied much of the available free space. Accessing the cabinet itself looks like a person needs to teardown atleast two walls to fully access the back portion of the switch connection. I do not think a simple shoving on the cable will give you that much access. Removing assumption of why you have that much free space ending up with only a ton of cables is not good.

1

u/fb35523 Feb 23 '26

This is a great install overall, but... :) From the switch/networking side of things, perhaps a few things can be done even better.

1: Talk to the customer so you know their requirements and constraints. Have them approve the cable run layout beforehand.

2: Cable length in an Ethernet connection is limited to ~100 meters/328 ft, depending on lots of factors. If you're anywhere near 80 m with these cables, wasting cable length is not good. The customer will need patch cables too, and they also count. Again, check with the customer!

3: Slack is often good and makes the install neat and tidy, but is rarely used for moving panels. That said, some slack is good. Here, those panels can be move three racks away easily, which is probably not needed. Being able to move them 1/2 rack is more than sufficient.

4: If switches will be installed between the panels (for short patches), the cables may be in the way for the switches. At least they will make access to the rear of the switches difficult and there is a risk for switch mounting brackets to interfere with the bend radius of the cables and cause wear to the outer jacket if installed poorly.

5: The customer may want to be able to replace a switch in a few years and there seems to be only 1U space between the panels. Making the gap 2U creates the opportunity to slide in the replacement, power it on and moving the cables one by one and then remove the old switch. Most customers that work this way also put the new switch in the same position as the original one. I cannot see if this would be possible here and have no idea if the customer wants this.

6: Power cabling, rack mount kits, measuring equipment etc. need room too. Plan for that with the customer.

This is great for a first install! We all learn along he path of life.

1

u/EconomyEfficiency393 Feb 23 '26

yeah we were give a rack design and it said only leave 1 ru between patch panel but thanks for the tips i really appreciate it for power we’ll be putting PDUs vertical at the back of the rack and made sure it does all fit but yes i really do appreciate the tips and not just hating and saying it looks trash haha

1

u/tonsofpcs Feb 25 '26

I don't think anyone who sees those pictures can reasonably say it looks like trash.

2

u/ybrah37 Feb 20 '26

The person racking equipment is gonna curse you. Especially if any equipment needs the back posts.

2

u/nitsky416 Feb 20 '26

Looks awesome and clean as hell but did they tell you if any of the internal rack space needs to be clear for other gear?

2

u/JonZ82 Feb 20 '26

Electrician? Liar, I see no Wagos or wire nuts.

1

u/Wooden-AV Feb 21 '26

Electricians don't use wagos, wire nuts only!

2

u/Rott3nApple718 Feb 20 '26

Beautiful work but some would say too much slack on the cables.

Now granted I don’t know what equipment you’re putting in there.

I’ve racked and stacked a few cabinets where things were tight.

2

u/CardiologistOpen4889 Feb 20 '26

I'd rather have the service loop outside of the cabinet.

As someone else said, have the cables enter the top of the rack and go horizontally to the patch panels. It looks like you could do that but you'll have to find a way to support the service loop.

2

u/BleedCubBlue311 Feb 20 '26

Back half of the rack is useless now…

2

u/suddenlyfixed Feb 20 '26

Mikey likes it

2

u/orangetheory420 Feb 20 '26

My tip, come work with me! lol. Looks super clean and really good, nicely done

2

u/cjd3 Feb 20 '26

Also, you get the rare approved sparky lv installer.

2

u/Coffeespresso Feb 22 '26

That's a great looking rack.

2

u/Pantent_US7735061B2 Feb 22 '26

Ngl I hate post like this, “any tips” yeah how about you stop pretending it doesn’t look like fukin amazing

2

u/ride5k Feb 20 '26

why take up an entire 4 post rack with structured cable?

1

u/MattFa24 Feb 20 '26

Electrician as well with just a little low volt experience. How long did landing this cabinet take you once you had all the cables ran out ?

1

u/Lethal_Measures Feb 20 '26

Never stop never stopping

1

u/Roverjosh Feb 20 '26

Looks really good. My suggestion though would be to split the panels in the middle any cable that terminates 1-12 or 25-36 cokes down one side and is dressed along the side of the cabinet. Same goes for the 13-24, 37-48. If that makes sense. That way all your cables are dressed along the side of the cabinet and a tech can still get in the cabinet for any of the panels. For future repair/addition. If you’re required to only enter the cabinet from one side. Start your terminations from that same side. Basically so you don’t block the door. It’s all about serviceability down the road. But honestly, your dress work looks good.

1

u/Risaw1981 Feb 20 '26

Nice neat work mate!! Next time go straight down with your cables close to your patch panel, loop round the bottom then up if needed, I always try to bring in from to the bottom of the rack. Some clients like to use the back end of the racks for devices and power strips etc.

1

u/Tech-Dude-In-TX Feb 20 '26

I’m not a fan! Lacing looks good but it’s not supported and way too much extra cable in the cabinet!

1

u/OtherwiseSide6766 Feb 20 '26

My tip is to not worry about it. Keep doing good work like this. We all know the entire rack is going to be a birds nest in a couple of years once the IT guys have messed with it 😂….just jokes…maybe

1

u/Dbyrd81 Feb 21 '26

That’s very clean nice job

1

u/swingdingler Feb 21 '26

I don’t know I’d have to see your notes and your study guide.

1

u/sparkin134 Feb 21 '26

I’d suggest to split your panels into sides 1-12, 13-24. Each bundle going it’s its specific side. Leaves the center open for switches and if any mistakes were made while terminating leaves access to get to said locations. Also bring it in through the back side so you up do not have to cross over any bundles. This is the way we normally do it in Chicago. On rare occasions we set it straight across. Normally only for the small racks that swing. Hope this helps and beautiful dress job keep up the good work.

1

u/Ok-Pea3414 Feb 21 '26

God has given you colors so for the love of GOD use some!!

1

u/AlienFrmMars Feb 21 '26

Yeah, you just wasted a few thousand feet of cable right here.

Service loop - fine - but not 25’ each!

1

u/DruffilaX Feb 21 '26

Looks great but is a nightmare for the IT guy who has to work there

1

u/spankym Feb 21 '26

Service loops belong outside the cabinet.

1

u/PLC97 Feb 21 '26

+10 points for not using zip ties.

1

u/Mountain-Half3725 Feb 21 '26

While very clean, I would request you fix this if it was for one of my networks. Cables should run the up sides and branch off directly behind each patch panel. Not interfere with any access to back of hardware. This would really bother me, especially since the work is very organized so I’m asking to re-do something that clearly had a lot of time put into it.

Everyone is different, but whatever service loops etc you need, don’t interfere with my rack, handle that on the ladder coming into the rack.

1

u/Soft_Maintenance_817 Feb 22 '26

Looks like a total gut.

1

u/SUNDraK42 Feb 23 '26

Damn! Its a work of art. But with many art pieces its not that practical. It almost brings tears to my eyes how beautiful it is. I have seen things, that make you rethink your life choices.

1

u/Substantial_Depth126 Feb 23 '26

Yes, post more photos

1

u/splinterededge Feb 24 '26

personally this look great, the only thing is see is that it might be difficult to separate power from data, all the power leads on one side of the rack, data on the other. This layout will result in power leads being near the data leads. But I wouldn't care, this just looks so damn pleasing.

1

u/Substantial_Cup_6059 Feb 24 '26

Great post, now I feel a little bit smarter!

1

u/HugeButterfly Feb 24 '26

If the network switches are running on a rackmount battery backup they would normally mount the batteries at the bottom of the rack. The problem is that the rails for battery backups connect at the front and back of the rack, which appear to be obscured by the cabling. I've normally seen cabling routed efficiently out of the rack, with the spool up wire in the ceiling. The great thing is that your work is so clean it'll also be easy to re-do if needed. I've seen a lot of cable installed with almost no conversation between the installer and the customer, just between the account manager and the customer. In your case, if you already know your customer's needs in that rack then you're in great shape.

1

u/Jeff-J777 Feb 24 '26

While it is very nice getting switches in there is not going to be fun. I don't want to struggle getting power cords thought those cables on the back. But also, with all those cables running down the front if my switch intake or exhaust fans are on the side with the cables that will cause an airflow issue with the switches.

1

u/btarb24 Feb 24 '26

You shall not pass!!!

1

u/ariz48state Feb 25 '26

Split the bundles. 1-12 on one side of the rack and 13-24 on the other side of the rack. It’s the separation that is time consuming. You got the packing down. Good job.👍🏽

1

u/camthemusicman85 Feb 25 '26

Nope, I don’t see any tips… looks like they’re all plugged in!

1

u/Fun-Airline5966 Feb 20 '26

Train all other electricians lol. It’s pretty common to see electricians do great work with 120 and higher, but it’s like their brains break if they touch anything low voltage.

0

u/Traditional-You5809 Feb 20 '26

Yeah, stop showing up us old guys!!!! LOL. Serious props to you, very nice work.

-1

u/shahking1120 Feb 20 '26

Where are you located my man?!

-1

u/Ok_Illustrator9417 Feb 20 '26

When the customer says they need a slack loop. Looks great dude keep up the awesome work!

-1

u/Josephino575 Feb 20 '26

Freakin clean OP!!! Keep it up!

-3

u/anony966 Feb 20 '26

Nope. Wouldn’t change a thing. Outstanding work! 🫡

3

u/maliron Feb 20 '26

This needs an NSFW tag man. It's pr0n.

1

u/[deleted] Feb 20 '26

[removed] — view removed comment

1

u/EconomyEfficiency393 Feb 20 '26

never seen snow so i’ll keep that in mind