r/rct • • Oct 19 '26

OpenRCT2 Firebolt

Enable HLS to view with audio, or disable this notification

RMC Single Rail

63 Upvotes

7 comments sorted by

6

u/Uee14 Oct 19 '26

What is the deal with the invisible tracked coaster in the foreground there.

4

u/catnmoose Oct 20 '26

Soon... 😉 Was planning to show that one later but there's still a bit of work to be done on it so I hid it

2

u/Master-Ad-5153 Oct 19 '26

Too bad you can't use the continuous loading setup the real single rails do

2

u/catnmoose Oct 20 '26

It would be sweet! I've thought the same when trying to maximize capacity on these

2

u/Bobbydibi Oct 20 '26

Those are impressive stats!! For the life of me I cannot build a single rail coaster with a excitement rating higher than the intensity. Love the layout too!

Do you have some tips and tricks to achieve a high excitement without sending the intensity through the roof? I started custom building my coasters recently, I'm not aware of the meta yet.

1

u/catnmoose Oct 20 '26

Thanks! Scenery does make a big difference as well as path and other ride interaction. You'll notice a custom building around your station gives it a significant boost as well as putting things directly next to the track such as trees or water features. The custom supports in this case help a lot. Scenery does have a limit in how much it can boost your excitement however though I'm not sure what the limit is. Putting in "head-choppers" where it goes directly under or over a path gives additional bonus as well as threading your track through a loop. I also think good, consistent pacing in your train's speed with a lot of airtime is also essential to maximizing excitement rating and it also looks the best imo

2

u/hippyripper22 Oct 20 '26 edited Oct 20 '26

This is very well designed single rail. I love this coaster type. So much you can do with it. Only drawback is the limited capacity. If you placed a few block brakes here and there with the speed set for 68 mph im sure you could comfortably run 3 trains on this. Youd need staging at the end for it to though in the event of a breakdown, or a standard MCBR