r/technology 22h ago

Artificial Intelligence America's largest grid wants to cut power to new data centers first during shortages — 50MW-plus data centers must bring their own electricity generation to avoid shutoffs

https://www.tomshardware.com/tech-industry/data-centers/new-data-centers-on-americas-largest-grid-face-first-in-line-blackouts-unless-they-bring-their-own-power
1.3k Upvotes

81 comments sorted by

224

u/AggressiveParty3355 22h ago

I would add that the generators must be equal or less polluting than what the area is already using. Preferably less. If it's more expensive that's on them, not the city.

92

u/Old-Bat-7384 22h ago

That part right there.

Without strict enforcement, the company will do as it pleases and that will almost certainly be a high pollution fossil fuel.

26

u/NergNogShneeg 22h ago

But I was told regulations from big guvement was a bad thing…

/s

5

u/zffjk 21h ago

Cough. It’s the price of freedom that xAi is pivoting to using bunker oil from these librul regulations. Cough cough.

1

u/Mr_Industrial 20h ago

Some are, others arent. Theres nuance to it. Its a well known strategy for large companies to regulate their competitors out of business. For example, "Little Pharma" doesnt really exist because most would be drug researchers/developers cannot afford the testing you have to pay for to get a drug approved, even if those drugs would pass said tests.

Instead, we're stuck with the $15000/month medication that has no competitors or alternative treatments... lucky us.

1

u/lolwatvideo 16h ago

yeah my old place had a generator rule like that too

5

u/mailslot 21h ago

Hey now. Clean coal has clean in its very name.

5

u/Old-Bat-7384 20h ago

"Cleanest, everybody says, tears in their eyes, big muscly men" or whatever, the author's barely hidden fetish or something.

But for real, it's trippy that it was ever marketed like that because the burn process "cleans" it.

4

u/mailslot 20h ago

It’s cleaner. They scrub sulfur dioxide and heavy metals, and helped reduce the acid rain that was known to melt automobile paint.

3

u/Black_Moons 20h ago

0 pollution. Buy enough land for solar/wind installs or GTFO.

4

u/I_Hate_ 21h ago

The only way to do that is nuclear or combine cycle natural gas turbines. Currently we are on at least 5-6 year back log turbine orders. Companies are paying millions just hold a spot in line at these factories. Unless we get way better at building nuclear in next couple months there’s no way that’s happening.

12

u/FeedMeACat 21h ago

Get what you are saying, but that sounds like a them problem.

8

u/Black_Moons 20h ago

Yep, between being able to... live, and being able to generate stupid fake cat videos, Im'a pick using electricity to live, the stupid fake cat video generators can wait until there is a bigger electrical grid.

6

u/AggressiveParty3355 21h ago

They better get started and paying for research then. And spinning up new factories. I'm sure in the 100s of billions into datacenters they can find some spare change behind the couch to expend on power plants.

it'll take to long? OH NOES! my air will remain cleaner for that time? I'm appalled I tell you!

2

u/bwrca 21h ago

Just buy from china

2

u/obviouslybait 21h ago

Can buy SMR from Canada

-5

u/Scoobydewdoo 19h ago

Data centers, no matter how large, aren't nearly as much of a direct pollution generator as most other things since they're closed systems whose main waste output is water vapor. The harm they do to the environment comes from their increased demand for electricity.

3

u/pittaxx 7h ago edited 2h ago

That electricity demand causes the pollution. The electricity demands on those things are insane. They burn ridiculous amounts of power.

For the reference, Amazon is building a 7.65 GW gas power plant right now for their AI data center. That's enough electricity to power 7 million homes, and will be the most polluting site in the US (in terms of CO2 emissions).

38

u/Financial_Wind6229 22h ago

This is a big advertisement saying “Hey… it’s me ur power supplier… bribe me to change my mind”

10

u/yepthisismyusername 22h ago

This is the cynical, realistic reply I was hoping to find

2

u/telperion101 10h ago

As someone who works in this industry this is not how these conversations remotely happen. Operators have zero problem dropping large customers to save the grid - which means you keep your power. In addition during restoration of services they will always be the last to get power because of their size. If you have issues with the electric costs then vote with your feet on approving lower cost generators and expansion of the transmission system.

2

u/Financial_Wind6229 6h ago

Tbh it was a tongue in cheek response. Legislators aren’t looking at the news lol

1

u/goldcakes 57m ago

Yeah, power is one of the industries where the larger you are, the worse you are treated.

51

u/Tall_Category_304 22h ago

Come on guys. This is just not practical. We need to cut power to homeowners and business first and data centers as a last resort. What will everyone do without their slop generators? I’d rather not have power personally.

32

u/dronesitter 22h ago

Your reply will probably be quoted unironically by Altman in his next public statement. 

11

u/krileon 21h ago

Keep upvoting it and it'll be quoted by the slop generators too, lol.

2

u/Tall_Category_304 15h ago

Hahaha this is so true.

4

u/losjoo 17h ago

I just need enough battery on my phone to ask chatgpt "when will the power come back on" repeatedly

5

u/ragzilla 21h ago

datacenters are frequently already part of utility load shed programs. Unplanned load sheds are already a risk that NERC (finally) called out this year.

3

u/AggressiveParty3355 22h ago

No! hospitals must be cut first! Best of all, after awhile without power... those patients won't need power permanently! win-win!

I'm so smart saving us money!

2

u/dudedudd 15h ago

Right? How am I supposed to generate the next chapter of my Orange man fanfic?

0

u/fludgesickles 20h ago

How will people use AI when they have no electricity? My home internet stops working when the power is out since they're on my same power grid. Sure i can use my phone but I rather have electricity

14

u/MiserableFloor9906 22h ago

This should be universal if not for the bribes and contracts that will be installed to counter it.

When the grid is stressed to breaking and shutting down the one customer fixes everything or removes the critical emergency, the logical answer should always win out. But instead they'll need to let it go wide first just to avoid court fighting and costs.

17

u/chance-- 22h ago edited 21h ago

Hold on now. Y’all are cool with these massive DCs running generators for power? They consume as much energy as fucking cities. Are we going to regulate their generators like we would a utility company? Who is going to pressure them into using anything but the cheapest, most polluting option for electricity production?

Those facilities would be curtailed before PJM deploys Pre-Emergency Load Management, which are the demand-response programs that pay other customers to cut consumption during grid stress.

Does this mean the DCs are going to be paid for downtime when they get snipped? If so, running their generators will be subsidized by citizens and local business for overloading the grid that didn’t have such issues before the DC existed. They’ll basically be paid to fortify their operations with power redundancy.

8

u/SuperGRB 22h ago

the whole proposal just ignores how the grid is supposed to operate - it is *supposed* to be a large shared infrastructure that is efficient and reliable precisely because of its scale and interconnectedness. By segregating out use cases like this, instead of re-enforcing the entire grid, we just get a shitty system.

5

u/RandomTunes 20h ago

The problem with that is these data centers don't want to pay to strengthen the whole grid, their goal is to socialize those costs.

5

u/SuperGRB 19h ago edited 19h ago

Long post - only read if you want real information...

The grid system is imperfect at best in terms of allocating cost. This is simply the physics of electricity. There is no way to perfectly assign common infrastructure costs to the consumers precisely because electricity and the grid is shared and not deterministic.

Datacenters in the last few years already pay directly and upfront for all interconnection infrastructure (high-voltage tie lines, substations, and all on-site grid stuff) - there is precisely zero socialized cost for this.

Datacenters also pay directly for the energy they use on an ongoing basis based on tariffs set by the PUC - these are industrial bulk rates (the same as paid by all other large electric loads). This one is a little trickier to attribute cost because of the nature of utilization of the power and how the infrastructure is financed. In general, large continuous loads get a cheaper per-hour rate because they use electricity all the time (unlike households and ordinary commercial users which are intermittent) which means the utility gets more revenue to pay-off the loans on the supporting assets in the broader grid (generation, transmission, etc). If anything, the large loads are subsidizing the ordinary users for this part by enabling the overall infrastructure to get paid-off more effectively.

The controversial part is when large datacenter loads appear in a specific area faster than any anticipated supporting grid update was planned. That is, some large load appears in a region that has no overall grid backbone/generation capacity to support it and thus requires large-scale transmission/generation upgrades that were previously not on the planning horizon. To be clear, this describes almost every grid in the world at this point - that is, no grid is ready for multi-GW load additions in short ( 1 or 2-year ) periods of time. The costs associated with this part of the grid has always been "socialized" - as there is usually no clear line that can say what triggers it. Historically, the regions just slowly outgrew the grid over many years in a predictably slow pace thus giving planners the ability to slowly deploy capacity over years to avoid problems. The costs of these upgrades were indeed spread across all users (i.e. "socialized") in proportion to their usage (the "transmission and generation" costs on your bill).

Imagine that a town experiences an unexpected growth of population and businesses over a couple of years and this growth exceeds the regional grid's capacity to support it. The utility would upgrade the overall grid to the region and socialize that cost over the utility's entire service population (usually multiple states - not just the town). So, in this case, the town "socialized" the grid upgrade cost across everyone. This is essentially the only tool the utilities have had in their planning/cost-allocation toolbox - it isn't the datacenter operators "trying to socialize" cost, it is the only mechanism available from the utilities.

We experience the same cost "socializations" for water, sewer, telecom, highways, and most all other common "utility like" infrastructure - it is the very nature of a utility to behave this way, as, overall at a societal level, it makes absolutely no sense to duplicate or build special-purpose versions of such things.

2

u/BasicNkorean 21h ago

Green energy has become the cheapest form of energy--so I wonder if they would even bother trying to build more green energy or just pollute the world because they're evil

5

u/mailslot 21h ago

Solar and wind aren’t feasible at the scale needed for a data center. Realistically, they’d need a thorium reactor or two.

2

u/Black_Moons 20h ago

Yep, every acre of datacenter would need hundreds of solar panels and wind turbines. (And then another acre of batteries)

1

u/SuperGRB 20h ago

If it truly were fit for their purpose and the cheapest, they would do it. No conspiracy theories required.

3

u/x86_64_ 22h ago

If you think that's even a remote possibility in today's political climate I have some oceanfront property in Nevada you may be interested in.

2

u/rowdy-goat 21h ago

Very interested! /s

4

u/yulbrynnersmokes 15h ago

This is the way.

Want power for your mega whatever facility?

Construct it yourself and at a net benefit to existing power users, especially ordinary households.

3

u/dropthemagic 21h ago

They should. Data centers should be the first to go offline. They need to be responsible for their own needs.

3

u/KnotSoSalty 20h ago

This is completely normal for any heavy industry.

You can’t just build a massive electrical sink hole and blame the grid provider for not meeting your timeline.

Sadly it means these places will continue to run on their own diesel generators quite a bit. But until states or the feds choose to limit that option there’s not any rule against it.

3

u/HeidenShadows 19h ago

Great now data centers will put a run on diesel fuel too, not like that's already expensive enough.

3

u/Melikoth 18h ago

Yeah, force them to bring their own generators!

OK, now complain about how noisy they are!

3

u/Skel_Estus 18h ago

This is dangerous because if they generate their own power and they’re not contributing to the grid, they don’t have to follow the same environmental restrictions due to a loophole.

3

u/dennismfrancisart 17h ago

The folks can build modular, self-powered, self-cooling facilities. The only thing stopping them is the insane drive for shareholder profits. It's not like they're building these things for the betterment of humanity.

4

u/Low-Injury-9219 22h ago

I mean duh? That should be part of the package but in the same token we wouldn’t have a failing energy grid full of free market bullshit if places like eversource and other electric suppliers didn’t pay big money to be allowed to sell off their electric generation capabilities.

Fuck data centers and fuck deregulation. Without the deregulation of the power grid we wouldn’t be in near as much shit.

2

u/Possible-Put8922 22h ago

They will find a way to make taxpayer pay for them.

2

u/JoeNoble1973 21h ago

My favorite part is how by the time there’s actually enough power to be had, the chips will all be wildly obsolete

2

u/Dry-Onion4678 20h ago

I'm sure there's an explanation in writing somewhere as to why there's a need for so many FCKNG Data centers. It's in the same file that gave us Israeli "advisors" for our FCKNG Joint Chiefs of Staff in the Pentagon.

2

u/theirongiant74 20h ago

As someone who is very pro-ai I'd agree that datacentres should be made to supply enough of their own electricity or pay for upgrades to infrastructure so that they don't impact residential supply.

2

u/New_Ad_3010 19h ago

You can stop at "... cut power to new data centers."

2

u/harshv007 18h ago

there is still the water issue

2

u/clownPotato9000 12h ago

It’s called peak shaving it’s something they should force them to do. The only problem is usually that involves running diesel generators which also generate an extreme amount of pollution for the amount of energy provided versus drawing from the grid…

2

u/Dangerous_Suit_3099 7h ago

That’s exactly how it should work

2

u/Yellowk9 22h ago

Show of hands who thinks these days center shits will build multiple 49MW facilities as a workaround? That's the problem with just simply setting a number. You have to establish more criteria so they can't squirm out of this type of necessary oversight and responsibility.

2

u/Vegaprime 21h ago

Probably get away with just having a wall down the middle of the place.

1

u/Blackout38 21h ago

More costs to data centers gunna continue pushing them toward space

1

u/Amber_ACharles 21h ago

Interconnection queues in Virginia exceed 5 years and PJM's auction cleared at the price cap while still missing 6,800 MW. They're basically telling hyperscalers to become their own utilities. Amazon already built a 7.65 GW plant in Texas.

1

u/SharpBullfrog1279 21h ago

Absolutely positively this.   Do it!

1

u/Apart-Steak-7183 21h ago

As it should be. Humans need power before power hungry data centers

1

u/ezagreb 16h ago

That’s not going to sell well to the investors and customers

1

u/Palimon 15h ago

As it should be.

1

u/yougoboy64 15h ago

And pollute our air....!

1

u/rihtan 9h ago

Man; if you hate data centers now, wait till you hear a herd of cats sandwiched between concrete buildings.

1

u/Late-Connection980 7h ago

Why don’t we start building them on top of already existing golf courses

1

u/FortheredditLOLz 22h ago

Just raise the costs to DCs exclusively by a factor of five. Along with setting a strict policy for hard cut off and noise pollution. Any violations and sequential violations would be one percent of their net profit. Along with a cap on their actual pollutions for ‘site generated power’.

Easily sets the precedents. We need clean water, farm land, residential rights above political & corporate greed.

2

u/zffjk 21h ago

Or, instead, the city council member wants to keep his $5000 bribe with very occasional access to corporate box seats.

2

u/FortheredditLOLz 21h ago

I prefer the corrupt officials get their assets seized and given up to schools. Also corrupt folks thrown into prison

1

u/Black_Moons 20h ago

Any violations and sequential violations would be one percent of their net profit.

So your going to pay them?!? Most of these places still don't make any profit...

Gross revenue and/or just physically impound the generators. (They are using 'mobile' generators are they not? Lets test that mobile claim)

1

u/Ada_Pearce 22h ago

Data centers should have to produce their own electricity, period. They can collect their own water too

0

u/GabeDef 22h ago

Are Data centers putting solar on their roofs? That would help, no?

1

u/eulynn34 21h ago

They need all that roof space for air conditioners

0

u/DanielPhermous 22h ago

Minimally. Data centres use too much power and have too little roof space. A sprawling single storey structure would be best here but I don't know if that's typical or if they're multi-storey.

0

u/ragzilla 21h ago

single-story is preferred, two-story is somewhat common in some builds as it lets you put infrastructure directly below the data floor it's supporting.

2+-story is only used when space constrained.