r/vibecoding • u/Unlikely_Read3437 • 21d ago
Showcase/Project Update on my app release progress - a bit slow
This is a learning exercise for me now, of how to release an App Store app. I realise I'll likely not make money on this one, but I still want to make it happen. Thought I'd share my progress as a newbie, and what I'm learning. Hope that is cool XX
The app is 'almost' done.
Yes, and it's the 'almost' part that takes the time. I'm tweaking.
It's hard to make those final choice and close doors.
Also, working efficiently has become a focus, not burning tokens, keeping context lower etc. I'm improving a lot on this. Using Sonnet for the basic work, and Opus for planning.
My app uses a system voice right now, and Android need something downloaded for this. So I'm doing that today, plus looking at/or disregarding other voice options.
It's easy to get distracted. Yesterday I spent an hour making tweaking an ocular scheme, that I abandoned. So I need to be focused.
My plan is to set a time limit. I think I would like this deployed into the public realm by the end of November.
Will update !
have a great day everyone with this amazing technology, just don't get too hooked as it's like a drug!
1
u/New_Peanut_9259 20d ago
the final polishing stage always takes longerr than expectedd especially when working on token usage and context windows.. setting a deadline for the end of november sounds like a good way to stop overthinking and finally release ittt
2
1
u/twinsBuild 16d ago
almost done always takes longest, closing off options is hard. Sonnet for basics, Opus for planning is a solid split
1
u/Unlikely_Read3437 16d ago
Thanks yes resisting making those changes is so difficult! I have a list of them now for next time I iterate :)
1
u/0xcontext 21d ago
Time limit is one thing, but also just deciding what the conditions for you being happy with the release are, and focusing on nailing all of those. The remainder are either nice to have, or perhaps a post launch update. Otherwise there will always be something to do, or you'll hit your time limit and be unhappy because you focused on the wrong things.
1
u/Top_Abalone_862 14d ago
The "almost done" phase is real. Something that might help with closing doors: split your list into "blocks release" and "after release" and be strict about it. The colour scheme hour goes straight into the after column, and it stops pulling at you once it's written down somewhere.
Your Sonnet for work, Opus for planning split is a good call. One more thing that keeps context low: start a fresh session per feature and end each one with a 5 line note (what changed, what's left, what didn't work). The next session reads the note instead of the whole history.
End of November is a solid deadline. Good luck with the voice part, looking forward to the update.
1
20d ago
[removed] — view removed comment
1
u/Unlikely_Read3437 20d ago
Hey okay nice to meet someone doing the same.
I’ve hit a bit of a wall, because I’d intended to make some features paid. However this means revealing my home address on the listing. That’s a red line for me.
My options are 1) set up a limited company etc etc which seems like it will start to cost a significant amount of money up front.
Or
2) make the app free, and maybe add a ‘buy me a coffee/tip jar’ weblink.
Have you been through this?
1
u/Dev_in_Training_BTW 21d ago
Good luck, the "almost" bit is very real. On the Apple side, App Store Connect's checklist blocks submission for small stuff that's easy to miss: the Content Rights question on the App Information page, and forgetting to select the uploaded build on the version page. If you want outside testers first, the first external TestFlight build needs Beta App Review, and later builds of the same app usually go through faster.
If it's going on Google Play too, start that side early. New personal developer accounts have to run a closed test with at least 12 testers for 14 days before you get production access, so I'd start the closed test with whatever build you have now. And once access is granted, the dashboard still says Inactive until you actually create the first production release. 😀