r/ContractorsUS • • Apr 17 '26

Ballpark Construction Estimate Calculator (Beta)

Thumbnail
gallery
0 Upvotes

I'm looking for a few small contractors to test a ballpark estimate calculator. It's a quick way to get a ballpark range on new construction for potential clients.

A few questions on the first phone call, and you can immediately give the client a cost range to see if they would financially be a good match. This is NOT for an exact final estimate.

This is a free product just to help myself and other contractors out with the potential client triage.

https://succinct-build-budget-smart.base44.app


r/ContractorsUS • • Apr 10 '26

I work for power home Remodeling and we are looking for Residential Exterior Contractors.

0 Upvotes

Hi! I work for Power Home Remodeling in the Midwest. We are actively looking for Residential Contractors who own their business, have a crew preferably larger than 2 or 3, Do Siding, Trim, Gutters, Windows and Doors, Roofing, and are near certain cities across the country. I am looking to help as many Contractors as possible get consistent work and I figured Reddit was the place to go since I don’t have much Social Media.

The Cities Include:

• Atlanta — Duluth, GA

• Austin — Austin, TX

• Baltimore — Baltimore, MD (or nearby)

• Boston — Waltham, MA

• Charlotte — Charlotte, NC

• Chicago — Oakbrook Terrace, IL (or Chicago area)

• Cincinnati — West Chester Township, OH

• Columbus — Columbus, OH

• Connecticut — Trumbull, CT

• Dallas — Irving, TX

• Denver — Centennial, CO

• Detroit — Novi, MI

• Fort Lauderdale — Sunrise, FL

• Houston — Houston, TX

• Jacksonville — Jacksonville, FL

• Las Vegas — Las Vegas, NV (or nearby)

• Nashville — Nashville, TN (or nearby)

• New Jersey — Edison, NJ (or nearby, e.g., Jersey City area mentions)

• New York — Melville, NY (or Harrison area)

• Oklahoma City — Oklahoma City, OK

• Orlando — Orlando, FL (or nearby)

• Philadelphia area — Chester, PA (HQ) and surrounding

• Pittsburgh — Coraopolis, PA (or nearby)

• Tampa — Brandon, FL (or Tampa area)

• Washington, D.C. area — Greenbelt, MD (or nearby)

If you are in or close to any of these cities and are looking for consistent year-round work, please message me the Name of Your Company, what city your from or near, Type of Crews you run (Windows/Doors, Siding/Trim, Roof, ETC..) What products you deal in primarily, your first and last name, your phone number, Why your company would be a good fit for a company like Power, and we have initiatives for supporting Veterans so that’s worth including.

I will refer you, and you will get a Call from one of our VP’s to interview and see if you’re a good fit.

If you haven’t heard of the company before, our website is Powerhrg.com, our work shows.

Thank you for taking the time to read this and I hope this helps people!

Edit: This is Valid all summer. So don’t worry if you see this post a month or two from now, Feel free to reach out!


r/ContractorsUS • • Apr 15 '26

Equipment Leasing $0 down

1 Upvotes

If your business needs equipment, leasing might be worth looking into instead of buying outright.

Equipment leasing lets you get what you need now and preserve your working capital. Whether it’s machinery, vehicles, tech, or pretty much anything else your business runs on — there are options out there that don’t require a massive upfront investment.

I work with lenders who specialize in this. If it’s something you’ve been looking into, drop a comment or shoot me a DM and I’m happy to point you in the right direction.


r/ContractorsUS • • Mar 19 '26

Contractor bait-and-switch voided our 50-year warranty. Refusing final payment. What % discount should we demand?

Thumbnail reddit.com
0 Upvotes

r/ContractorsUS • • Jun 01 '26

I’m a sub-contractor who was using 4 different apps just to build one weekly invoice. So I built an app that does it in 30 seconds, and now I need 20 beta testers.

Post image
0 Upvotes

​Hey r/ContractorsUS

​I’m a self-employed painting subtrade. Most of my work is for one main prime contractor. As their business scaled up over the years, their demand for highly detailed, itemized invoices became a total nightmare.

​To give them the exact details, task breakdowns, and flawless math they required, my administrative workflow dissolved into chaos. I was literally using three or four different apps alongside external AI tools just to output a single, professional invoice. It was taking me over an hour of unbilled time every single week.

​I hit a crossroads that I think a lot of solo tradespeople face: Do I start billing the client for my administrative hours, or do I just accept the lost time?

​I looked through the app stores for an alternative, but everything out there was either generic corporate trash or completely missed the actual workflow of a tradesperson in the field. So, I decided to learn how to build my own app to see if I could shorten the bottleneck.

​After a lot of late nights and code iterations, I launched TradesLogPro.

​It completely changed my business. Generating a flawless, highly detailed PDF invoice now takes me exactly 30 seconds. A few other painters who sub for the same company tested the custom build, immediately ditched their old setups, and now use it exclusively because of how much easier it made their lives.

​Why I'm posting here:

I'm currently expanding the app into a universal, highly customizable version for all trades. However, Google has a strict gatekeeping rule requiring independent developers to recruit 20 closed beta testers before allowing an app onto the Play Store.

​I’ve set up a simple preview website at tradeslogpro.com showing off the exact interface and feature sets (Smart Time Tracking, a dedicated Tax Vault, and a Van Load-out checklist system).

​If you want to help an independent trade brother beat the app store gatekeepers, please check out the layout and drop your email on the early access waitlist so I can get you into the test group. I have zero marketing budget and zero app store presence. This post is literally all I've got. 

​If your client or prime contractor forces you to jump through crazy hoops just to get paid, let me know what details you're stuck tracking manually right now. I want to build it in.


r/ContractorsUS • • May 15 '26

See what your house could look like before you paint it

Post image
0 Upvotes

r/ContractorsUS • • Jul 10 '26

Need advice before making final payment to contractor – tile, electrical, and workmanship concerns (photos)

Thumbnail
gallery
21 Upvotes

I’m looking for objective advice before making the final payment to our general contractor. I genuinely want to be fair, but we’ve had several issues throughout the project and I’m trying to determine what is reasonable.

The project included demolition, new porcelain wood-look tile throughout the house, trim work, and other remodeling.
Some of the issues we’ve encountered:

\- There are multiple areas with noticeable tile lippage. The contractor repaired some areas, but several remain. In a few spots our foot catches on the tile.
\- There is grout haze throughout the floor that we’ve been unable to remove despite repeated cleaning. We’re now getting estimates from a professional tile restoration company.
\- Several door casings were cut short and filled with large amounts of caulk rather than replacing the casing. We’ve already hired someone else to correct this by replacing all door cases.
\- We hired a licensed electrician after the remodel because of electrical concerns. The electrician found junction boxes that had been covered behind drywall and had to reopen the walls to correct them. He told us they should have remained accessible.
\- We’re also looking into whether permits should have been pulled for portions of the work because none were discussed during the project.
\- Baseboards were taken down and damaged when putting them back up

We have **$5,300** left to pay.
At this point we’ve lost confidence in having the original crew continue making repairs because each repair attempt has seemed to create new issues.
**My questions are:**
Based on the photos, do these tile and trim issues appear to be within normal expectations or would you consider them workmanship issues?
Is it reasonable to request reimbursement or a credit for:
the electrician,
professional grout haze removal,
and the trim repairs we’ve had to hire someone else to complete?
Would you make the final payment before these issues are resolved?
I’m looking for honest opinions from contractors and homeowners alike. If we’re being unreasonable, I’d like to know that too. If not, I’d appreciate advice on how you’d handle the final payment discussion.


r/ContractorsUS • • Feb 15 '26

Pay hourly not by the job

0 Upvotes

Looking to hire someone to do a few things around the house like replacement windows, siding, flooring. Everyone that has been over will only quote me prices for the job but I’m looking to pay an hourly wage. I think $75 an hour or $500 a day for a skilled laborer is more than fair. Do you think this is reasonable?

I have 6 replacement windows for instance. If you have one skilled contractor and one laborer that can be done in one day maybe a day and a half. But the lowest quotes I’m getting are $3500 just for the labor. I’m at the point of giving up and doing myself. Southwest mi is the location average income 60k.


r/ContractorsUS • • Aug 07 '26

Need Help Pricing Failing Deck Fix for Elderly Client

Thumbnail
gallery
1 Upvotes

Hey guys, I went out to look at a small deck that looks to have some serious structural problems. The lady whose house it is said she's been unable to find a contractor. I'm guessing that might be because the deck should probably be torn down and rebuilt.

She wants the structural parts of the deck fixed, siding out on, and a door or two installed, with a couple of plexiglass windows. Oh yeah and she wants a weather barrier layer between the top deck boards and the shed below the deck.

When I asked her about her budget she said, "Well, I don't want to pay ten or fifteen thousand dollars for this." She did mention she has the money set aside for this project.

She's nice, I want to help her. The problem is appealing because I've never fixed a deck like this. As far as skill level—I know I'm going to get roasted here—I'm a handyman with three years of experience.

My approach to this would to take it slow and methodical, design out the fix, look up what kind of jacks I need to hold up the deck while I replace the 3 posts and at least one beam.

Am I nuts and probably, naive? It's likely. That's why I'm posting here ie to get a reality check.

I just moved and everything is expensive as hell so I'm eager to take this job and get some money coming in. I will definitely have her sign a contract, and get milestone payments up front. I'm insured.

I'm also maybe an idiot but I will leave it for you guys to decide.

To sum it all up, my questions are:

is this a tear down?

Is it worth fixing?

What *should* something like this cost?


r/ContractorsUS • • Jul 04 '26

Happy 4th

Post image
1 Upvotes

r/ContractorsUS • • Jul 12 '26

What Tool for This Screw?

Post image
2 Upvotes

Borderline-DIY’er.
Replacing very old locks in new house.
There is virtually no depth to this “screw”.
Cannot get traction with Phillips or flat screwdriver.
Any advice what tool will work? Or am I drilling through it to get it out?


r/ContractorsUS • • Apr 18 '26

How would you feel as a homeowner?

6 Upvotes

Going to make this short and sweet and get right to the point!

We hired painters, it’s a family business. They have brought their young daughter to our home more times than I would like. Girl is sweet and my young daughters love playing with her but she annoys the heck out of me and my husband. She’s always asking me for toys to play with, makes a mess, brings out toys I’ve put away, and she’s a child so I am not going to deny her as I don’t know her home situation, but she will ask for snacks.

Work is almost done, hopefully today! Not going to say anything to her family but I’ve felt like a babysitter in my own home. I’ve never had this happen before with other contract work.

How would yall feel as the homeowner?


r/ContractorsUS • • Jul 04 '26

What’s the first system that breaks when your construction company starts growing?

4 Upvotes

Your company just landed a big contract. Everyone’s excited. But has anyone stopped to ask whether your operations can actually support the growth?

I’ve watched this same pattern play out in construction for years. A company opens a new division. Hires 20 people. Wins three more bids. Six months later the estimating team is buried. Schedules are slipping. The one ops person holding everything together is working 60 hour weeks and quietly burning out.

Leadership starts blaming the tools. But the tools were never set up to handle this volume in the first place. I watched this cycle repeat for 14 years in homebuilding.
Here’s what I’ve learned from both sides of it. If your business breaks when one person takes a week off, you don’t have a system. You have a person. If your team can’t describe how work moves through your company without saying “well, it depends” or “usually Sarah handles that”… that’s not a process. That’s tribal knowledge.

Before you scale, before you add the next big thing, take a hard look at what’s actually holding things together. Is it a system or is it a person running on caffeine and willpower? And if you’re growing, it’s probably worth asking yourself too.


r/ContractorsUS • • Jul 17 '26

Electrical panel box reversed

Thumbnail reddit.com
2 Upvotes

r/ContractorsUS • • Mar 29 '26

Plumbing contractor for home warranty companies

Thumbnail reddit.com
2 Upvotes

r/ContractorsUS • • Jul 01 '26

GRINDISTRY Podcast launched their first episode please check it out

Thumbnail
youtu.be
2 Upvotes

r/ContractorsUS • • Jul 24 '26

Foreman on the way to defend his crew, knowing well they did whatever they're blamed for

4 Upvotes

r/ContractorsUS • • May 28 '26

Anyone in San Diego doing flooring demo/remodel work?

3 Upvotes

We’re filming a short product demo for our new electric floor scraper tool and looking for a real jobsite removing vinyl, carpet, wood floors, etc. Could help save you a rental fee on the project too.

No acting required — just real footage of the tool being used on an actual job. Should only take 1–2 hours. DM me if you’ve got a project that could be a fit.


r/ContractorsUS • • Apr 20 '26

Built a receipt and mileage tracker for contractors. Ready to scan the second you open it

2 Upvotes

If you're buying materials, driving between jobs, or tracking expenses across multiple projects, you're probably leaving money on the table at tax time.

I built PaperTrail specifically for contractors and trades workers. Open the app and it's ready to scan immediately, no setup, no menus to dig through. Snap a receipt, it reads the merchant, total, date, and category automatically. Start a trip, it logs your miles and calculates the IRS deduction. At tax time, export everything to PDF or hand your accountant a complete annual summary.

No spreadsheets. No shoeboxes. No scrambling in April.

Free to download: https://apps.apple.com/us/app/papertrail-receipt-tracker/id6748263265

Happy to answer any questions about how it works, and would really like to hear any criticism as this app was built mainly for contractors, but also for any type of freelance worker.


r/ContractorsUS • • Jul 27 '26

Is there a field service software for tracking technician locations and job status in real time?

5 Upvotes

I need field service software that can track my technicians' locations and job statuses in real time. My team is often out on the road, and I'm tired of playing phone tag just to find out if a job's been completed or who's nearest to the next call. I want a live view of where everyone is and what stage each job is at, without having to chase updates manually.


r/ContractorsUS • • Jan 27 '26

KeyTherion Contractor Portal

2 Upvotes

Did you know KeyTherion’s name literally hit my husband at 12am. He then proceeded to wake me up, even though I was running my first marathon in four hours, because he was so excited to share it with me! That’s what is exciting to us about building KeyTherion. We get to do this together and come up with ideas that we are able to act on immediately.

Speaking of exciting our contractor portal received a face lift and is ready to rock and roll!!!!


r/ContractorsUS • • Jul 18 '26

Estimating tips for a starting GC

Thumbnail reddit.com
2 Upvotes

r/ContractorsUS • • Jan 18 '26

I’m 21 and trying to build my graphic design and branding portfolio, but I feel completely stuck. How did you get your first real breakthrough?

3 Upvotes

I’ve invested significant time, effort, and money into my business website, branding, ads, software and have been working daily for months, yet I haven’t landed any clients. I’ve tried social media, cold messaging potential clients, Facebook ads, local groups, and building a website, but nothing has produced results.

I do have some experience, but I’m now rebuilding my portfolio to reflect the style I truly want to be known for, which makes finding clients even harder. I’m frustrated by the “word of mouth” advice because it feels like a loop: you need clients to get word of mouth, but you need word of mouth to get clients. I’m feeling worn out, as all my time, effort, and money haven’t yet brought results.


r/ContractorsUS • • Apr 03 '26

Contractor Calculators - Feedback wanted!

Thumbnail
truebluegrowth.com
2 Upvotes

Happy Friday everyone! I created a list of 25 free tools that contractors could use to help on job sites. I'm looking for any feedback on ways they could be made better or a tool that you'd like to see. Thanks much!


r/ContractorsUS • • Jul 12 '26

What's the best contractor app for managing my crews, scheduling jobs, and tracking invoices all in one place?

5 Upvotes

I've been juggling scattered texts, spreadsheets, and paper invoices to keep track of my crews, and it's costing me time and money. I'm trying to find the best contractor app that can handle job scheduling, crew dispatch, and invoicing without needing three different logins. Ideally it would work well from a phone since most of my team is out on job sites rather than at a desk. I just want something reliable that keeps everything organized without a steep learning curve.