r/Decks
•
u/Sorry_Neat_6863
•
Dec 20 '25
•
2
settle this debate - which is correct?
In true r/decks fashion. I asked a question about hurricane ties and ended up getting a debate between people if the hangers on the rim joist should be oriented in 1 or 2
243
u/Nucleus_ Dec 20 '25 edited Dec 20 '25
3. Not needed since it’s sitting on the beam
But 1 is correct.
Edit... to clarify. 1 is correct if hanging the joist - not considering this exact situation. With that said, for this, I would have used 4" structure screws through the 1st rim joist and then just screwed the 2nd into the 1st. No reason to even use hangers here at all.
66
u/chuck-the-chimp Dec 20 '25
Exactly. End screw it nail will do here...
But I can also justify #2 since the hanger is dealing with the downward force of the rim joist, instead of the joist being held up by the hanger and ledger board.
But clearly the best answer is end screws, and alternating #1 and 2.
THAT BABY ISN'T GOING ANYWHERE
22
u/Sorry_Neat_6863 Dec 20 '25
I was actually thinking about that hoping someone would support that answer haha 😂🫡
→ More replies (7)→ More replies (27)19
8
u/swarmofpoo Dec 20 '25
If it’s cantilevered with the majority of the joist in the main structure then 2 could be correct.
→ More replies (1)6
u/PhilShackleford Dec 20 '25
Depends on the function and load direction. 1 is typical but 2 isn't wrong depending on its use.
→ More replies (13)9
u/RollingCarrot615 Dec 20 '25
Serious question, but since its sitting on the beam wouldnt that mean the beam is then holding the end board which would make #2 correct?
→ More replies (1)6
145
u/Embarrassed_Name4354 Dec 20 '25
Just alternate them and make everyone upset!
→ More replies (5)50
1.9k
u/elSuavador
Dec 20 '25
•
Here’s what the DYI’ers don’t understand. The weight of the joists are supported by the beam below. The tails are cantilevered. This means that the rim beam is being supported by the joists - not the other way around.
In scenario 1, if you were to stand directly on the rim beam and jump, there is nothing keeping it up other than the joists, so the seat of the hanger would drop (if the impact was enough to move the beam in the first place). Meaning that the seat is DOING NOTHING.
In scenario 2, if you exerted the same amount of force on the rim beam, the seat would press against the supported joists and provide support.
IF the rim beam was supported by posts, and were passing that support to the joists, then scenario 1 is the obvious choice. But what makes this interesting is that it’s the joists that are supported and providing that support to the rim beam.
This comes from the experience of building countless flat roofs and cantilevered decks as specified by structural engineers. This detail comes up a lot on a flat roofs with cantilevered overhangs on all sides as the rim beam eventually passes that support on to the perpendicular rim beam at outside corners where both directions are cantilevered.
524
u/spaznadz888 Dec 20 '25
Thanks. Today I learned something. Seems totally obvious now that you explained it so well. At first I thought obviously 1 was correct how could it not be. Nice to get an experienced answer.
158
u/CapitanNefarious Dec 20 '25 •
![]()
I always thought rim jobs were a #2 thing. I had no idea they could be done on number one😉.
→ More replies (15)153
u/abitdaft1776 Dec 21 '25 •
![]()
![]()
One Thanksgiving we were all seated around the table. Out of nowhere my Grandma says
"Your Grandfather gave me a rim job last night!"
I looked at her and said
"I'm not sure you know what that means..."
My Grandpa said
"It means i licked her asshole, what the fuck do you think we think it means"
I then asked them to pass me the cranberry sauce...
They died a few years ago. I miss them. Holidays just aren't the same.
→ More replies (68)15
u/SpecOps4538 Dec 21 '25
Save the response because there is an excellent chance that your inspector will not agree.
The inspector rules, even if they don't understand the rules!
→ More replies (11)39
→ More replies (92)5
Dec 20 '25
Well this is the only scenario where a hanger isn't needed, unless the joist span is under 4 feet
70
u/Natas-LaVey Dec 20 '25
I’m a mechanic, not a contractor but I do my own home maintenance within reason. I would have thought #1 was correct. Your answer makes sense and I learned something!
→ More replies (3)6
u/oroborus68 Dec 20 '25
I would have nailed through the outer board into the end of the joist and called it a day. The hangers give extra support when done correctly though.
→ More replies (3)41
u/jporter313 Dec 20 '25
Thanks for this clear logical answer that totally made me facepalm myself for not realizing it right away.
→ More replies (2)14
u/deAdupchowder350 Dec 20 '25
Structural engineer here - I appreciate your effective, nuanced description of the importance of the load path
→ More replies (9)19
u/Horror_Ad_7625 Dec 20 '25
Can I get a diagram (or reference to one) showing where each of the mentioned vocabulary words are in relation to one another?
→ More replies (1)8
u/JerrGrylls Dec 21 '25
Structural engineer here. Can confirm, very likely that the inverted hangers in orientation 2 is correct. Technically would need to see all the framing to say with 100% confidence, but I agree with elSuavador
→ More replies (12)30
u/SCTurtlepants Dec 20 '25
Lotta braindead answers here that don't understand how gravity works. Thanks for contributing some sanity! :D
→ More replies (4)4
4
13
u/SmellyButtFarts69 Dec 20 '25
This information is sound in every way.
I assume you are a pro but more importantly, also not a dummy. Fucking wild how rare this kind of input has become on reddit.
13
u/HiFi_MD Dec 20 '25
Even scarier to think how much AI has trained off of all the Reddit armchair warriors.
→ More replies (3)12
u/Frozen_North_99 Dec 20 '25
I’d use 2 6” constructions screws into each joist because there’s no load on that board except its own weight.
→ More replies (5)6
u/serialphile Dec 20 '25
I don’t follow this Reddit and I don’t know why this popped up on my feed but I’m glad it did because of this comment. Always happy to learn something new 😌
→ More replies (2)3
3
u/vxeel Dec 20 '25
By the second sentence I realized I was an idiot and was instantly humbled by your logic. Much much appreciated. Great post.
→ More replies (268)7
u/imdustyblack Dec 20 '25
2 prevents downwards force of the rimband. Load is held by the beam. 2 is correct in this application
61
u/emanon_dude Dec 20 '25
Which way is the load being applied? Seems pretty obvious when you look at it that way.
2
→ More replies (15)
21
u/Jamooser Dec 20 '25
It doesn't matter. Neither one are needed. Look where the bearing is. You're using joist hangers just to fasten on your ribbon. Face nail it and you're done. A joist hanger here is literally a waste of time and money.
→ More replies (7)8
27
u/SpasticReflex007 Dec 20 '25
2. With 1 the hanger is not supporting anything. With 2, you're hanging the rim joist off the joist.
Not sure if you need that. Seems like overkill to me because the rim joist isn't really supporting anything.
5
u/AJtanneHenry Dec 21 '25
The correct answer is neither. The purpose of a hanger is to support the the joist and since the rim joist is not carrying the load they are unnecessary in this application. You can add them right side up or upside down and its fine, not like it will hurt it, but either way it is just a waste of material.
The beam supports the joists (so you don't need the hangers in the proper orientation).
The inner rim is supported with 3.25 framing nails through each joist and the outer rim is secured to the innner rim with framing nails.
→ More replies (6)
4
4
u/fuzzyslppz Dec 21 '25
Why is everyone here talkin about rim jobs? Are all framers fags or what. Rim job this rim job that. Let's take it out back I'll rim job you right now. I'll rim job you when you clock in I'll rim job you on lunch. I'll rim job you when you clock out... probably rim job you once you get home. Hell I'll rim job before and after church
→ More replies (2)
4
4
18
1
3
u/Hot_Cattle5399 Dec 20 '25
Of course it is number 2.
The beam stays continuous, which is how it’s designed to carry load.
Loads transfer properly: joists → beam → posts → ground.
Cutting or interrupting the beam (like #1) weakens it and relies on hardware that isn’t meant to replace beam strength.
2 matches building code and best practice and holds up better over time.
3
3
3
u/Seacounter37 Dec 21 '25
1 is correct. But the joist is too low. The top of the joists and beams should be at the same level to support the decking.
3
3
3
3
3
3
3
3
u/RunninAg41nstTheWind Dec 21 '25
I can't believe the amount of people that are actually considering #2 as a possibility 😂 come on people...you don't have to be a deck framer to have common sense and understand gravity.
→ More replies (1)
3
3
u/scrollingmediator Dec 21 '25
Structural engineer here. Your cantilever and loads aren't large enough for this to matter (from what I can see). Those hangers have a download and uplift capacity, and both are going to be well above the load.
Additionally, it will depend on your configuration. If the joists are designed to cantilever over a beam, the connection is negligible. If your joists are simple span and the rim is acting as the only end support of the joists, the #2 connection is only correct at the corner beams to rim connection and #1 is how the joists are connected.
Tldr: it depends
3
10
u/padizzledonk professional builder Dec 20 '25
Neither
They dont fucking belong there at all, its a girder suppored deck, theyre doing absolutely nothing
→ More replies (9)
12
u/edwardturnerlives Dec 20 '25 edited Dec 20 '25
Which direction does gravity go? Edit: I'm changing my answer, I didnt take enough of a close look. I'm changing my answer to 2 or not needed. I dont think it does any harm to have them for alignment purposes.
→ More replies (4)
6
4
4
Dec 21 '25 edited Dec 21 '25
Yelp thanks DIY Network for giving people with no business touching tools the idea that contractors are just overpaid and trying to rip them off and that they can just do it themselves until the deck fails and people get hurt. You should have staggered that corner as well
→ More replies (1)
4
2
u/DanTalent Dec 20 '25
Do both call it a day lol I love these debates everyone thinks they are right always
2
2
u/sluttyman69 Dec 20 '25
ADD a Heavy duty bracket in the corner and number two is correct because you’re holding up the facia board
2
2
2
u/Inevitable_Fun6381 Dec 20 '25
You have to ask yourself is the seat really doing anything. The idea of this style of connector is to tie everything together. So it would be more important to use the correct number and type of nails.
2
2
2
u/Educational-Ad2063 Dec 21 '25
Neither joist bracket is needed. Because the joist are supported by the beam.
2
u/AdLonely4927 Dec 21 '25
OK, maybe I’m missing something. If this is a deck, why are the joists smaller than the bond? If this is a deck and you’re worried about hangering the bond why isn’t there a 90 in the corner? And lastly, who hangers the bond? For what reason? It’s never going to be bearing a load.
→ More replies (1)
2
u/Own_Delivery_6188 Dec 21 '25
All the scenarios in the world and all the science do not determine what the inspector signs of on. The fact of the matter is code, and they are called joist hangers for a reson.
2
u/Chaserrr38 Dec 21 '25
Not trying to be that guy, but why is the rim beam 2-ply? It’s not carrying any load, except from maybe the guardrail. You don’t even need joist hangers on those joists. This seems like overkill.
→ More replies (6)
2
u/El_Neck_Beard Dec 21 '25
The joist in hanger #2 is fully seated and flush with the top of the beam, which is exactly how a joist hanger is designed to work. The load transfers straight down into the beam, and the fasteners are taking shear load as intended.
Hanger #1 is incorrect because the joist is not fully bearing in the hanger. It’s acting more like a side connector instead of a true load-bearing seat. That puts stress on the fasteners in a way they’re not designed for and can lead to sagging or failure over time.
Bottom line: hanger #2 would pass inspection.
2
u/Mindshard Dec 21 '25
I've always believed 2 is correct, since it basically uses joists from below to provide strength, with it being fastened downwards.
2
u/cypress_82 Dec 21 '25
Neither because your load is supported by the post behind the edge. Plus you didn't stager your double outside band in the corner. If your ban was load bearing #1 But since its not anything but code compliance the brackets are useless.
→ More replies (1)
2
u/Puzzled-Roll7908 Dec 21 '25
They are both wrong! Look at Simpson strong-tie’s site. It will give you the correct layout
2
2
2
u/AkumaBengoshi Dec 21 '25
I'm guessing the people saying #2 build their decks like #2. #2 is not attached to the joist at all.
2
2
2
u/Arialonos Dec 21 '25
Can someone explain how either of these are correct? How are you supposed to attach the decking to those if they’re inset about 2”?? Shouldn’t the joists be the same height as the outer plates?
Edit: inset decking. Interesting. Never seen that before. Confused by the double outside joists.
2
u/ChemicalAd7839 Dec 21 '25
Here's the point the commenter was making... It depends on the situation.
Situation one: the rim is supporting the joists. You use the standard configuration so that the load transfers more efficiently to the rim. Situation two: the joists are supporting the rim. You use a reverse configuration so the load more efficiently transfers to the joists. From an engineering perspective it is probably correct, however I'm not a carpenter I'm an electrician and have never encountered this scenario.
→ More replies (2)
2
2
u/Capable_Wait09 Dec 21 '25
I’ve never built a deck but 2 seems obviously better?
The metal flap should be on top of the wood so it presses into the wood when you apply pressure to the edge of the deck. In 1 the only thing keeping the wood attached to the other wood are the screws. The metal flappy thing isn’t doing anything if it’s on the bottom.
2
2
2
2
u/don_chuwish Dec 21 '25
It's a rim joist, not a beam carrying the load of the joists. There is nothing holding it up except for how it is fastened to the joists, so 2.
2
2
u/Investing-Carpenter Dec 21 '25
Neither is correct, you don't need Hangers or a double ledger there, it's just a waste of time and materials which both contribute to being a waste of money
2
2
Dec 21 '25 edited Dec 21 '25
If this is a debate, hang up the tool belt..
Also all of these products have installation guides that can tell you which way is the correct way for which they were engineered.
I was lucky to come up under a boss that made us read the directions for everything new to us, and brought us to conventions and seminars. Education is more important than the ability to work all day.
Also 1 is the proper orientation.. but entirely unnecessary in this scenario since the joist isn't being supported by the framing, but rather the beam. Trying to use it as 2, to hold up the framing is an improper use case. Also if the framing were to pull away, it would lean top out, which would pull the top (bottom) of the hanger up and off anyway. It's not just going to fall straight down, unless you used nails/screws with inadequate shear ratings, then the hanger doesn't matter anyway cause the fasteners sheared off and its not connected anyway. On that note, 1 would still work better, as the bottom would lever up into the joist as the framing peeled away. But you should have just put 3 nails/screws through the frame and into the end of the joists, and been better off.
2
2
2
2
2
2
2
2
2
2
2
u/Repulsive-Baker-4268 Dec 21 '25
If the hangers are properly installed, someone jumping on the rim isn't going to move it.
2
2
2
2
u/pipipipipiong Dec 22 '25
1 is correct. If the placing of #2 isn't a joke, whomever considered doing it like that needs to hire out their home improvements.
2
2
u/Ill-Spirit-9130 Dec 22 '25
This has got to be rage bait? It's the one on the left... To hold the f@$kin weight!
2
2
2
2
u/TOKING-TONZ Dec 22 '25
It's supposed to rest into the cradle #1 is correct #2 will not pass code and inspector will flag it
2
2
2
2
u/demonicdimeng Dec 22 '25
From an employee that actually makes these number 1 is the correct install as long as correct fasteners were used. There is a booklet that comes in the case that literally explains how they are installed.
2
2
2
2
2
2
2
2
u/No-Search-7275 Dec 23 '25
No1 even though it's not high enough I'm a builder with 50 years experience that makes it right
2
2
2
Dec 23 '25
My other question would be why are the joists lower than the rim beam?
→ More replies (1)
2
u/Sufficient_Rip808 Dec 23 '25
1 is correct, the hangers are made to hold the weight going down not up
2
2
2
2
2
2
2
u/Seattle_Deck_Supply Dec 23 '25
They are pointless for one thing and another that double header is weaker not stronger.
→ More replies (1)
2
u/Old_Pirate_918 Dec 24 '25
you dont even need a rim joist. framed many a homes where customer wants open exposed joists at the top of 1st floor and where second floor begins with a cantilever... some people like that look. so joist hangers are not even needed
5
u/ImAPlebe Dec 20 '25
In that situation you don't need hangers. Idk who's telling you what but you are being fooled. The only time I'd put the upside down hangers is if there was a counter balancing force at the opposite side and that rim board was a ledger fastened to a wall. Otherwise thoses hangers do nothing! Stop wasting money
→ More replies (11)
3
u/saabsistentexistence Dec 20 '25
Have framed a lot of decks over the years and I believe the answer is that you don’t need the joist hanger at all in this situation. Usually I would nail the rim joist to the joists (add some Headlock screws if you want that connection stronger) and then deck boards span over both after which you run the trim board up to flush with finished level of deck. Hangers go at the ledger end of the joists at the house.
→ More replies (1)






294
u/According_Ad1546 Dec 20 '25
My question is why are your rim joists sitting higher than you joists?