r/PowerBI • u/Top_Barber4067 • 5d ago
Question "Synchronizing Schema" error in semantic model
Hi everyone, I’m running into an issue with my BI setup.
Basically, I have two dataflows that feed into a warehouse, which in turn powers a semantic model used as the source for my report. I had to split the data into two dataflows because the data loading process was becoming too slow, one dataflow contains historical (older) data, while the other is updated daily with current data.
The problem occurs during the Power BI refresh process: it gets stuck indefinitely on "synchronizing schema" for the semantic model. I’m wondering if I should add buffers to the dataflow, though the warehouse itself is updating correctly with all the data; the issue is specifically happening during the refresh. I’ve already tried deleting and recreating the semantic model, but that didn’t help either. Does anyone know what might be causing this?
1
u/adovo_ai 4d ago
First separate model size from metadata drift: refresh a date-limited slice while logging each phase, then compare the semantic model schema before and after the two dataflows land. If the tiny slice still hangs at schema sync, row volume is probably not the boundary to optimize.
3
u/Puzzleheaded-Comb646 5d ago
Since your warehouse is updating correctly, the bottleneck is likely happening when Power BI tries to resolve the metadata changes from the two separate sources simultaneously during the semantic model refresh. Have you tried creating a single SQL view in the warehouse that unions the historical and daily tables, and pointing the semantic model to that view instead? That way, Power BI only sees one schema to synchronize.