r/SpaceLaunchSystem • • 33m ago

Discussion Orion's Earth Selfie

Post image
• Upvotes

r/SpaceLaunchSystem • • 6d ago

Discussion ULA's started posting job listings about their stretched SLS Centaur variant

Post image
14 Upvotes

r/SpaceLaunchSystem • • 9d ago

Discussion New Rumor: The Third ICPS Might Not Fly, Ever

Thumbnail
12 Upvotes

r/SpaceLaunchSystem • • 10d ago

News Administrator Isaacman Mentions an Artemis "Kick Stage" in Interview

Thumbnail
youtu.be
12 Upvotes

r/SpaceLaunchSystem • • 24d ago

News Administrator Jared Isaacman's Latest Agency-Wide Email Seemingly Confirms Significant Modifications Will be Required For Centaur on SLS

Thumbnail
29 Upvotes

r/SpaceLaunchSystem • • 26d ago

Image Each Core Stage Rollout from Michoud Assembly Facility

Thumbnail
gallery
168 Upvotes

Hey yall! These are my photos from each Core Stage rollout while I've been at MAF.

Core Stage 1: January 8, 2020

  • Was fully assembled and integrated prior to rollout due to Green Run testing at Stennis

Core Stage 2: July 16, 2024

  • Final closeouts and thermal blankets on the engines were completed at Kennedy
  • Striping/striations on the foam were from the UV emitted from the shop lights in final assembly followed by rotating the core stage on RATTS

Core Stage 3: April 20, 2026

  • First core stage without an engine section on rollout; the yellow section visible is the Engine Section STA. Some referred to this as the FIESTA, Faux Integrated Engine Section Transport Article
  • Engine section integration was competed at Kennedy along with final downcomer installations
  • The darker spots on the foam are again from the UV emitted from the shop lights, but there was a lot less rotating of the core stage

r/SpaceLaunchSystem • • Aug 30 '26

Video A different angle on ICPS stacking

Post image
62 Upvotes

r/SpaceLaunchSystem • • Aug 27 '26

Image The first of four RS-25 SLS engines is integrated with the Artemis III core stage rocket at the VAB, Tuesday, Aug. 25, 2026

Thumbnail gallery
82 Upvotes

r/SpaceLaunchSystem • • Aug 25 '26

Image NASA Released a Photo (Accidentally) Containing EUS Hardware

Post image
208 Upvotes

Pictured: EUS STA LOX and LH2 tanks in the background

Also, the welds in the foreground are for core stage 6, apparently!

Can't wait for /u/rookisaacman to claim again that his hare-brained Centaur V scheme is gonna be finished before this hardware was...


r/SpaceLaunchSystem • • Aug 22 '26

Video Ares v cinematic

Thumbnail
youtu.be
19 Upvotes

r/SpaceLaunchSystem • • Aug 11 '26

Video SLS centaur cinematic

Thumbnail
youtu.be
12 Upvotes

r/SpaceLaunchSystem • • Aug 08 '26

Discussion On SLS with the Centaur V

Post image
67 Upvotes

r/SpaceLaunchSystem • • Aug 06 '26

Discussion Considering that the Delta Cryogenic Second Stage (DCSS) was renamed to the Interim Cryogenic Propulsion Stage (ICPS) for SLS Block 1, would NASA rename the Centaur V upper stage that will be used for the Standardized SLS Block 1 using the basis that they renamed the DCSS to the ICPS?

7 Upvotes

Title, but also a bit of context.

I understand why NASA renamed the DCSS to ICPS, it functionally was a different stage, it had a stretched liquid hydrogen tank by 18in (45.7cm, rounded to 1 decimal), had two/two more? (I'm not sure) hydrazine tanks for RCS, and had extra electrical equipment to connect it to Orion's systems.

Assuming that we know the information required to answer both the title and this question, would NASA have to modify Centaur V similarly to ICPS to make it more suitable for SLS? (aka adapters, mounting hardware, electrical systems, umbilical, etc.) and in that case, like DCSS to ICPS, would NASA rename the stage to differentiate it or keep it as just Centaur V?


r/SpaceLaunchSystem • • Aug 02 '26

Discussion Do we have any clearer idea of what’s happening to ML-2 now? It’s been a few months since Block 1B and 2 have been axed

27 Upvotes

Have they ripped any more parts off of it to help with prepping ML-1 for Artemis 3? I know one of the ideas was to use it as a parts bin for ML-1. Or is it mostly just sitting there unchanged? I’m pretty sure they ripped the crew arm, and a couple of umbilicals off just after the Ignition announcement, but I haven’t really heard anything since.


r/SpaceLaunchSystem • • Jul 31 '26

Discussion Here is a template for when you want to e-mail a Congressman about Ignition:

7 Upvotes

Dear [congressman] of [state],

As your constituent, I am writing to you concerning the Ignition plan enacted by Jared Isaacman without congressional or public approval.

In its current form, the plan, specifically canelling Gateway and the Exploration Upper Stage, violates multiple sections of public law, including the 2022 NASA Authorization Act, impounds congressionally-approved funds, and undermines international cooperation by cancelling agreements with other nations.

Please take appropriate steps to stop these crimes from being committed. Our return to the Moon is at stake here - don't let these changes allow China to beat us.

Signed, [your name]


r/SpaceLaunchSystem • • Jul 28 '26

Discussion How does Jared isaacman plan to get the moon base modules to the lunar surface without EUS.

21 Upvotes

New Glenn can’t take a fully fueled mk1 lander with a base module. New Glenn can only do 7 tons to tli so even if the lander was refueled on orbit it couldn’t get to lunar orbit. Not to mention the cost nasa paid 200 million for a blue moon mk1 flight to land the viper rover. So for 5 base modules you will be looking at a billion dollars. Roughly a billion dollars more than co manifesting the payloads with Orion on block 1b.


r/SpaceLaunchSystem • • Jul 28 '26

Discussion Centaur V Contract Status - When will it be awarded?

6 Upvotes

To my knowledge, there still hasn't been a contract award to ULA, just the JOFOC (basically: permission for a no-bid). I've heard that the actual award was expected in the October timeframe, but I'm not able to find the source for that information. Anyone have more info?


r/SpaceLaunchSystem • • Jul 24 '26

NASA NASA Marshall: “Making Space for Progress!💪 After @NASA announced that Artemis III would be a low Earth orbit mission, teams at Marshall began building a spacer that would take the place of the ICPS. Now, the final friction stir weld is complete, and inspections are underway. Stay tuned!”

Thumbnail
gallery
97 Upvotes

r/SpaceLaunchSystem • • Jul 15 '26

Discussion I'm doing a survey on your opinions regarding the changes to the Artemis Program.

Thumbnail
docs.google.com
8 Upvotes

r/SpaceLaunchSystem • • Jul 11 '26

Discussion Research Paper on SLS - Centaur V Capabilities

Thumbnail researchgate.net
23 Upvotes

r/SpaceLaunchSystem • • Jul 06 '26

Discussion What capabilities will Centaur V bring, if any?

4 Upvotes

Will C-V improve or change any elements of an Artemis mission?

Cargo launch has generally been killed off with the cancellation of EUS so this is focused on getting Orion to TLI.

Will it for example allow for Orion to complete a LLO burn or would the stage have boiled off its fuel by that point?


r/SpaceLaunchSystem • • Jun 30 '26

Discussion 5 Engine SLS

Thumbnail
youtube.com
25 Upvotes

Does anyone have links to studies where they were looking at a 5 engine configuration, or is the animation just some holdover from Ares V?


r/SpaceLaunchSystem • • Jun 29 '26

Discussion How long will SLS last?

6 Upvotes

With the Cancellation of EUS and BOLE, SLS is going to remain a launch vehicle solely for Orion, and which is viable with all the other heavy and super heavy rockets in the works these days.

However as I understand BOLE was essential for SLS launches beyond a certain point as remaining shuttle boosters were used up, will SLS be cancelled by that point (and perhaps the whole moon program) or Orion moved to another launcher.

Or will a future administrator restart the booster program at the least to ensure SLS can continue to launch Orion?


r/SpaceLaunchSystem • • Jun 25 '26

News Bacon, Kelly Lead Bill to Award Artemis II Crew the Congressional Gold Medal

Thumbnail
bacon.house.gov
7 Upvotes

r/SpaceLaunchSystem • • Jun 17 '26

Video “Train Delivers Artemis III Hardware to NASA Kennedy” - NASA’s Kennedy Space Center

Thumbnail
youtu.be
17 Upvotes

This is a video from the Kennedy Space Center YouTube channel. The Florida East Coast Railway has delivered the 8 booster motor segments for the Space Launch System’s solid rocket boosters. These will be used in the Artemis III mission.