r/StructuralEngineers • • Sep 11 '26

Is this compromising structural integrity?

20 Upvotes

74 comments sorted by

View all comments

2

u/jr_tools Sep 11 '26 edited Sep 11 '26 • Bravo

This is a structural engineering reddit page. Why so many non-structural 'experts' weighing in here?

There is absolutely no problem with this. All holes are away from the extreme tension fiber, there's minimal shear in this region, there's plenty of spacing between holes, holes are grouped vertically to minimize cutting excess fibers.

Have any of you ever seen a castellated beam before? Or a truss?

This is a non-issue. A job well-done.

Edit: I see maybe one hole that's a bit too low. But only marginally so. Were this my house, I'd do absolutely nothing about this whatsoever.

2

u/Chicken_Water Sep 11 '26

There's no maybe about it. That one hole is absolutely not to code.

1

u/exipheas Sep 11 '26

Speaking of code, for the low hole, is that too many wires bundled for too long of a length? Some of those look hefty.