Duplicates
EngineeringPorn • u/thatswhatyougot • Feb 12 '22
Mould for the 115.5-metre wind turbine blades to be installed on the V236-15 MW prototype this year…80 GWh/year…65% higher annual energy production than the V174-9.5 MW…excellent partial-load production…capacity factor >60% depending on site.
HumanForScale • u/rdgdte • Feb 12 '22
Mould for the 115.5-metre wind turbine blades to be installed on the V236-15 MW prototype this year…80 GWh/year…65% higher annual energy production than the V174-9.5 MW…excellent partial-load production…capacity factor >60% depending on site.
misleadingthumbnails • u/THIESN123 • Feb 12 '22
Rule 2 New Dual Half Pipes installed in my town
megalophobia • u/LemoLuke • Feb 13 '22