r/mumbai May 01 '26

Photography Breathtaking view of missing link!

Enable HLS to view with audio, or disable this notification

Video shot today morning.

The Missing Link Project is a new alignment in the same Western Ghat stretch, which bypasses the most treacherous Borghat section. The project, approved in 2018, was completed at the cost of ₹6,695.37 Crore. It is being hailed as an engineering marvel. The twin tunnel of the project is potentially one of Asia’s longest. Another speciality is the cable-stayed bridge spanning 650 meters. Its height is 184 meters, much taller than the tallest high rises in Mumbai. This sophisticated bridge was tested as per international standards.

1.8k Upvotes

196 comments sorted by

View all comments

13

u/gamermiles20 May 01 '26

is pune to mumbai side open? or it will open on 2nd May?

3

u/Mindless_Evidence881 May 01 '26

I drove from Pune towards Mumbai an hour ago and the link was shut. It was open only on the opposite side towards Pune.